Skip to content

JSERC · Jharkhand State Electricity Regulatory Commission

Methods and Principles for Fixation of Charges including Cross Subsidy Charges Recoverable by Distribution Licensee Regulations, 2006

Jharkhand State Electricity Regulatory Commission (Methods and principles for fixation of charges including cross subsidy charges recoverable by distribution licensee) Regulations 2006

RegulationDated 12 Apr 2006Published in the Gazette 24 Sep 2007No . JSERC /74/390 dated The 12th April, 2006

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on jserc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is JSERC's principal regulation on how electricity charges — including cross subsidy — are to be built up and recovered by distribution licensees in Jharkhand. It was notified on 12 April 2006 (p1) and sits in the Jharkhand Gazette Extraordinary dated 24 September 2007 (p1); it comes into force on Gazette publication (cl. 1.3, p1). It applies to all distribution licensees, including deemed licensees, and to consumers receiving supply under the proviso to s.43(2) of the Act (cl. 1.2, p1).

The bulk of the document is definitional and conceptual rather than numerical. Section 2 fixes the consumer voltage classes (LT, HT, EHT) and defines authorised load (p2). Section 3 lays down the general principle that charges should track efficient cost of supply to each category, with the extent of cross subsidy to be shown in the schedule of charges approved by the Commission, and enumerates the heads of charge a licensee may recover — fixed charges, energy charges, loss compensation charges, meter/plant rentals, special charges under ss.46–47, and cross subsidy charge or support (pp2–4). It states that no charge may be recovered without the Commission's specific approval (cl. 1.7, p4).

Section 4 is administrative and consumer-facing: six-monthly publication and website disclosure of revenue data (cl. 1.8, p4), issue of a tariff card to each consumer within two months of a tariff order (cl. 1.9, pp4–5), the reach of demand-based tariff (cl. 1.10, p5), power factor/load factor rebates and DSM signals (cl. 1.11, p5), minimum-consumption billing for cross-subsidising categories (cl. 1.12, p5), penal billing for excess demand or consumption (cl. 1.13, p5), and miscellaneous service charges (cl. 1.14, p5).

Section 5 gives the cost-allocation method for each charge head — how fixed costs, power purchase cost, loss compensation, rentals, service charges and cross subsidy are to be distributed across consumers (p6). Sections 6 to 8 cover removal of difficulties (p6), the power to amend and the commitment to review and re-notify every three years (p7), and savings preserving the Commission's inherent powers and its freedom to depart from the regulation in special circumstances (p7). Notably, the regulation sets no tariff values itself: rates, rebates, penal rates and miscellaneous charges are left to be determined in tariff orders.

Standard name
Tariff Regulations
Primary topics
Tariff determination, Cost of supply and cost allocation, Subsidy and cross-subsidy

Read with this

No other documents to read with it are on Voltaic.

Voltaic last read JSERC's website for final documents on 24 Nov 2026 (5 pages) and for drafts on 21 Nov 2026. A document JSERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of JSERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on jserc.org ↗

Report an issue with this document