NERC · Nagaland Electricity Regulatory Commission
Multi Year Tariff Regulations, 2016
Nagaland Electricity Regulatory Commission (Multi Year Tariff) Regulations, 201 6
RegulationDated 21 Apr 2016NERC/REGN/2016 dated 21-04-2016
Summary
Summary written by software, from pages 1 to 32 of 229. Check the regulator's original before you rely on it.
The notification (pp1–2) establishes the Nagaland Electricity Regulatory Commission (Multi Year Tariff) Regulations, 2016 under the Electricity Act, 2003, and repeals the 2010 tariff-determination regulations (p4). It applies across Nagaland and, as supplied, covers the first 32 pages of a 229-page instrument: the preliminary chapter, the multi-year tariff framework, and the opening of the financial principles chapter.
Chapter 1 defines the tariff universe and key accounting, operating and commercial terms (pp4–13). It states commencement on Gazette publication, with tariff determination applicable from 1 April 2016 (p4), and requires separate ARR and tariff treatment for distribution wires and retail supply; vertically integrated utilities must file separate generation, transmission, wires and retail supply applications (pp14, 17).
Chapter 2 (pp15–28) sets the MYT process: a Business Plan, a Control Period ARR forecast, annual tariff determination, mid-term review and truing up against audited accounts. It distinguishes controllable and uncontrollable factors, specifies pass-through of uncontrollable gains/losses and sharing of controllable gains/losses, and prescribes filing, publication, objection and tariff-order procedures (pp15–23, 26–28).
Chapter 3 (pp29–32) begins the financial principles: debt-equity ratio, capital cost and capital structure, additional capitalisation, consumer contribution and grants, return on equity, and interest/finance charges on loan capital. Later chapters are cross-referenced but not supplied: generation tariff (Chapter 4), transmission (Chapter 5), distribution wires (Chapter 6) and retail supply (Chapter 7), with formats in Appendices A–E and Annexures II–III (pp19, 24–26, 32). The text has an internal Control Period inconsistency (pp7, 18).
Read with this
No other documents to read with it are on Voltaic.
Voltaic last read NERC's website for final documents on 1 Oct 2026. A document NERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of NERC's website on 1 Oct 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.