Skip to content

WBERC · West Bengal Electricity Regulatory Commission

Miscellaneous Provisions Regulations, 2013

West Bengal Electricity Regulatory Commission (Miscellaneous Provisions) Regulations, 2013

RegulationDated 2 Apr 2013Published in the Gazette 2 Apr 2013No. 52/WBERC dated the 2nd April, 2013

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on wberc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a WBERC notification of 2 April 2013 (No. 52/WBERC) making the West Bengal Electricity Regulatory Commission (Miscellaneous Provisions) Regulations, 2013, published the same day in the Kolkata Gazette Extraordinary (p1). It is a short omnibus regulation that replaces the 2005 miscellaneous provisions regulation and deals with two unrelated subject areas plus general housekeeping clauses.

Regulation 3 (p2–3) governs the State Load Despatch Centre's fees and charges. It empowers SLDC to levy an "SLDC charge" on licensees using the intra-state transmission system at rates fixed by tariff order or separate order, requires SLDC's operating body to submit statements of amounts and expenditure heads to the Commission for approval, sets quarterly-in-advance payment with annual true-up, allows the Commission to revise rates or specify other charges, and requires all SLDC operating expenditure to run through a dedicated 'WBSLDC Fund' account opened in a nationalised or scheduled commercial bank, with signing authority limits, audit by a practising Chartered/Cost Accountant and submission of audited accounts to the Commission.

Regulation 4 (p3–4) sets the security-deposit regime for distribution licensees: deposit size and its annual basis, replenishment notices and instalment recovery, pre-disconnection notice treatment, forms of deposit (cash vs bank guarantee vs letter of credit vs pre-paid meter), bank guarantee validity and renewal, refund and interest on cash deposits, appropriation against dues, additional deposit where the licensee provides dedicated assets, and cash-only deposits for certain temporary/short-term supply categories. It also preserves security deposits collected under the earlier 2003 notification and General Conditions of Supply.

Regulations 5–7 (p4–5) give the Commission power to vary or amend the regulations at its discretion, general power to remove difficulties by order, inherent powers, and the repeal of the 2005 regulation with a savings clause for action already taken.

Standard name
SLDC Fees and Charges, Security Deposit
Primary topics
SLDC and RLDC fees and charges, Security deposit, Payment security

Read with this

No other documents to read with it are on Voltaic.

Voltaic last read WBERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document WBERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of WBERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on wberc.gov.in ↗

Report an issue with this document