RERC · Rajasthan Electricity Regulatory Commission
Licensing Regulations, 2004
Rajasthan Electricity Regulatory Commission (Licensing) Regulations, 2004
RegulationDated 15 Mar 2004No. RERC/Reg. No. 20 dated 15th March, 2004
Summary
Summary written by software. Check the regulator's original before you rely on it.
The RERC (Licensing) Regulations, 2004 set out how the Rajasthan Electricity Regulatory Commission receives, processes and decides applications for transmission and distribution licences, and how existing licences may be amended. The notification (p1) is made under ss.181(2), 15 and 18 of the Electricity Act 2003 and applies only to licences for transmission or distribution of electricity (p1).
Clauses 3–4 (p1–2) prescribe the application route: Form-1 for a new licence, Form-2 for amendments, six copies to the Secretary, a fee prescribed by the State Government paid by demand draft, and a document set covering area maps, lists of local bodies, forests, monuments and defence establishments, a capital statement and corporate papers. Clause 5 (p2) adds further requirements — capital adequacy, creditworthiness and code of conduct as prescribed by the Central Government — for an applicant wanting to distribute within the area of an existing licensee.
Clauses 7–13 (p3–4) establish the public-consultation machinery: newspaper notices in Form-3, Form-4 or Form-5 within stated timelines, service of transmission applications on the State Transmission Utility, inspection of the application at the Commission, Electrical Inspector and applicant's offices, a thirty-day objection window, and Central Government clearance where defence establishments are involved.
Clauses 14–20 (p4–5) cover the decision: a proposed-grant notice in Form-7, the applicant's willingness, an indicative ninety-day decision window, rejection for reasons recorded in writing, a twenty-five-year licence term, onward copies to State Government, CEA, STU, SLDC, Electrical Inspector and local bodies, printing and public inspection of the licence and maps, and the amendment procedure including the licensee's consent. The Commission may also propose amendments in the public interest on its own motion (clause 10, p3).
Pages 7–25 are the seven statutory Forms: application formats with verifying affidavits and document lists, the three notice formats, and the licence instrument itself with its terms and conditions — security deposit, area, authorised lines and substations, nature of supply, subsidy implementation, general conditions under s.16, term and revocation.
Read with this
No other documents to read with it are on Voltaic.
Voltaic last read RERC's website for final documents on 24 Nov 2026. A document RERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of RERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.