Skip to content

KERC · Karnataka Electricity Regulatory Commission

Chapter 4 Operational Norms — Generation Tariff Regulations, 2009

CHAPTER - 4 OPERATIONAL NORMS

RegulationDate not stated

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on kerc.karnataka.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This document is Chapter 4, "Operational Norms," of an electricity regulatory instrument. It is not a standalone amendment; it states operating norms that govern recovery of capacity charge, energy charge and incentive by generating companies (p1). Clause 25 makes the chapter applicable to generating units that achieved commercial operation on or after 1 April 2009 and ties recovery to achievement of the norms (p1).

Clause 26 sets thermal generating station norms. It covers: Normative Annual Plant Availability Factor (NAPAF) for all thermal stations (p1); gross station heat rate methodology for new coal-based stations that achieved COD on or after 1.4.2009, based on a multiple of design heat rate, with a table of maximum design unit heat rates by pressure/temperature rating and coal type, and provisos for units with different parameters, separately guaranteed turbine-cycle heat rate and boiler efficiency, and mixed old/new units (p1–3); notes on weighted-average heat rate for mixed unit sizes, adjustment for electrically driven boiler feed pumps, and limestone consumption for desulphurisation (p3); gas-based unit/block heat rate methodology (p3–4); secondary fuel oil consumption for coal stations and an annual sharing formula for savings with beneficiaries (p4); and auxiliary energy consumption norms for coal-based stations by unit size, cooling-tower type and boiler feed pump drive, plus combined-cycle and open-cycle gas norms (p4–5).

Clause 27 sets hydro generating station norms. It gives criteria for determining NAPAF: storage and pondage plants by head variation, plants affected by silt, and run-of-river plants with plant-wise determination based on 10-day design energy data; it allows further Commission allowance for abnormal silt/operating conditions and lets a new hydro developer approach the Commission in advance for NAPAF fixation (p5–6). It then sets auxiliary energy consumption norms for surface and underground hydro stations by excitation type (p6). The text contains no issue date, Gazette date, notification number or named regulator.

Standard name
Generation Tariff Regulations
Primary topics
Generation tariff, Emission control costs

Read with this

No other documents to read with it are on Voltaic.

Voltaic last read KERC's website for final documents on 24 Nov 2026 (3 pages) and for drafts on 23 Nov 2026. A document KERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of KERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on kerc.karnataka.gov.in ↗

Report an issue with this document