TNERC · Tamil Nadu Electricity Regulatory Commission
Draft Tamil Nadu Verification of Captive Status of Generating Plants/Consumers Regulations, 2024
Tamil Nadu Electricity Regulatory Commission (Verification of captive status of generating plants/consumers in the State of Tamil Nadu) Regulations, 2024
Draft regulationDated 24 Jun 2024
Draft
A proposal, not law. Voltaic holds no final regulation made from this draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a draft regulation published by the Tamil Nadu Electricity Regulatory Commission for comment, with comments due by 15-07-2024 (p1). It sets out how the Commission proposes to verify whether a generating plant and the people taking power from it really qualify as captive, and what follows when they do not.
The preamble (p1–4) grounds the draft in Rule 3 of the Electricity Rules, 2005; an APTEL order in Appeal No.131 of 2020 upholding the Commission's power to depute TANGEDCO to collect and verify CGP data; and the Supreme Court's 2023 judgment in Dakshin Gujarat Vij v. Gayatri Shakti Paper, whose propositions on continuous ownership through the financial year, weighted-average treatment of ownership changes, the proportionality test with its tolerance band, checking of 'gaming', and SPV parity with an association of persons are reproduced. The Commission says it has also drawn on the Forum of Regulators' model regulations.
Regulations 1–4 (p5–8) give the short title, objective, statewide scope and definitions; the objective expressly covers consumers importing power from captive generators located within or outside the State (p5). Regulation 5 (p8–11) places annual monitoring of consumption and equity criteria with the distribution licensee authorised by the Commission, prescribes how a newly commissioned plant's first year is reckoned, how part-station captive units and multiple wind wheeling agreements are aggregated, when a plant spanning states is verified by the Central Electricity Authority, and requires an annual bank guarantee from captive users as payment security.
Regulation 6 (p11–19) is the operative core: the recognised classes of captive user, the consumption and shareholding tests and supporting documents for each, the treatment of subsidiaries and holding companies, the proportionality rule for group captive/SPV users and the exclusion of consumers who breach it, reporting and verification timelines, and the formulas for aggregate and net generation, including banking and start-up deductions and grossing-up of network losses.
Regulations 7–11 (p19–25) cover stakeholder obligations, a CGP web portal with alerts, annual submission, licensee verification and Commission declaration of status, metering, default by a shareholder, consequences in the form of cross-subsidy and additional surcharge, and dispute resolution with a bar on coercive recovery. Regulations 12–14 (p25–26) are the removal-of-difficulty, amendment and interpretation clauses. Annexures (p27–41) supply the data-upload appendix and certificate formats for ownership, consumption and proportionality.
Read with this
Voltaic holds no final regulation made from this draft.
No other documents to read with it are on Voltaic.
Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.