CERC · Central Electricity Regulatory Commission
Indian Electricity Grid Code Regulations, 2010 — Addendum and Corrigendum
RegulationDated 28 Jun 2010Published in the Gazette 3 Jul 2010No. L-1/18/2010-CERC dated New Delhi, the 28th June, 2010
Summary
Summary written by software. Check the regulator's original before you rely on it.
This two-page Gazette extraordinary notice from the Central Electricity Regulatory Commission carries an addendum and a corrigendum to the CERC (Indian Electricity Grid Code) Regulations, 2010. Both are dated New Delhi, 28 June 2010 and appear in Gazette No. 168 of Saturday 3 July 2010 (Part III—Section 4); a note at the foot of each page records that the principal regulations were published on 28-4-2010 in G.I. No. 115 (p1, p2).
Page 1 is the addendum. It inserts a new sub-clause 6.5.18(a) into clause (5) of Regulation 6 of the principal regulations. The new sub-clause overrides 6.5.18 in the case of forced outages of a unit, but only for stations that have a two-part tariff based on capacity charge and energy charge under long-term and medium-term contracts. For those, the RLDC is to revise the schedule on the basis of revised declared capability, and the revised declared capability and revised schedules become effective from the fourth time block, counting the time block in which the ISGS advises the revision as the first (p1).
Page 2 is the corrigendum, listing five textual corrections to the principal regulations by page and provision: swapping the order of "RPCs or RLDCs" to "RLDCs or RPCs" in Regulation 1(5)(iii); deleting a stray letter 'r' after the word "frequency" in Regulation 6(4)(7); deleting the word "other" in Regulation 6(4)(15); deleting the (-) signs in the illustration equations under Regulation 6(5)(13); and substituting the figures "1.4.2010" with "3.5.2010" in Regulation 6(6)(2) (p2).
What an analyst should note: the addendum is a substantive change to grid-code scheduling during forced outages, yet its operative wording — "shall be corrected as under" — is the same as the corrigendum's, so the new sub-clause is presented as a correction to page 128 of the principal regulations rather than as a standalone amending regulation. Corrigendum item 5 is likewise substantive rather than merely typographical, shifting a date in the principal regulations from 1.4.2010 to 3.5.2010. Neither page states an enabling provision or a separate commencement; the document's own dates are the 28 June 2010 issuance and the 3 July 2010 Gazette publication.
Read with this
No other documents to read with it are on Voltaic.
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of CERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.