Skip to content

AERC · Assam Electricity Regulatory Commission

Grid Interactive Solar PV Systems Regulations, 2019 — Second Amendment, 2024

AERC Grid Interactive Solar PV Systems Regulations, 2019, (Second Amendment), 2024

AmendmentDated 13 Dec 2024Published in the Gazette 18 Dec 2024

Amends the Grid Interactive Solar PV Systems Regulations, 2019.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on aerc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the second amendment to the Assam Electricity Regulatory Commission's 2019 Grid Interactive Solar PV Systems Regulations, issued on 13 December 2024 and published in the Assam Gazette on 18 December 2024 (p1). The preamble sets out the Commission's rationale — promotion of renewable technology under the National Electricity Policy, use of rooftop and waste land for solar, and the role of net/EXIM metering in cutting consumer bills and distribution losses — and records that the Principal Regulations, 2019 were gazetted on 6 August 2019 and first amended by regulations gazetted on 18 June 2024 (p1).

The operative text is short. Regulation 4 of the Principal Regulations, on General Principles, is substituted wholesale (p2). The replacement provision leaves it to the distribution licensee to adopt net metering, EXIM metering or gross metering, in line with Government of Assam policy directions, for consumers who want to install grid-connected solar within its supply area, on a non-discriminatory, first-come-first-served basis. The consumer's requested metering arrangement is stated to be final with that licensee, and the licensee is required to offer net metering for loads up to ten kW and gross metering for loads above ten kW (p2).

By clause 1.3 the amendment takes effect from the date of publication in the Assam Gazette, and clause 1.2 extends it to the whole of Assam (p2). No other regulations of the Principal Regulations are touched.

Standard name
Net Metering and Rooftop Solar

Read with this

The regulation

Amendments and corrections

Voltaic last read AERC's website for final documents on 30 Sep 2026. A document AERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on aerc.gov.in ↗

Report an issue with this document