AERC · Assam Electricity Regulatory Commission
Grid Interactive Solar PV Systems Regulations, 2019 — Second Amendment, 2024
AERC Grid Interactive Solar PV Systems Regulations, 2019, (Second Amendment), 2024
AmendmentDated 13 Dec 2024Published in the Gazette 18 Dec 2024
Amends the Grid Interactive Solar PV Systems Regulations, 2019.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the second amendment to the Assam Electricity Regulatory Commission's 2019 Grid Interactive Solar PV Systems Regulations, issued on 13 December 2024 and published in the Assam Gazette on 18 December 2024 (p1). The preamble sets out the Commission's rationale — promotion of renewable technology under the National Electricity Policy, use of rooftop and waste land for solar, and the role of net/EXIM metering in cutting consumer bills and distribution losses — and records that the Principal Regulations, 2019 were gazetted on 6 August 2019 and first amended by regulations gazetted on 18 June 2024 (p1).
The operative text is short. Regulation 4 of the Principal Regulations, on General Principles, is substituted wholesale (p2). The replacement provision leaves it to the distribution licensee to adopt net metering, EXIM metering or gross metering, in line with Government of Assam policy directions, for consumers who want to install grid-connected solar within its supply area, on a non-discriminatory, first-come-first-served basis. The consumer's requested metering arrangement is stated to be final with that licensee, and the licensee is required to offer net metering for loads up to ten kW and gross metering for loads above ten kW (p2).
By clause 1.3 the amendment takes effect from the date of publication in the Assam Gazette, and clause 1.2 extends it to the whole of Assam (p2). No other regulations of the Principal Regulations are touched.
Read with this
The regulation
- Dated 6 Aug 2019Grid Interactive Solar PV Systems Regulations, 2019
Amendments and corrections
Voltaic last read AERC's website for final documents on 30 Sep 2026. A document AERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.