Framework for Resource Adequacy Regulations, 2024
Gazette Notification of OERC (Framework for Resource Adequacy) Regulations, 2024
RegulationDate not stated
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a State Commission regulation that establishes Odisha's Resource Adequacy (RA) framework. It applies to GRIDCO, distribution licensees, generating companies, SLDC, STU and other grid-connected entities and stakeholders in Odisha (p2). The regulation sets the objective of reliably serving projected demand with an optimum generation mix, and divides the framework into demand assessment and forecasting, generation resource planning, procurement planning, and monitoring and compliance (p2, p6).
Demand assessment is assigned to distribution licensees. They must forecast monthly demand and energy for short-, medium- and long-term horizons, by voltage and consumer category, using listed statistical, end-use, AI and econometric methods, scenario analysis and historical databases (p6–9). SLDC aggregates the forecasts for the State and submits them to CEA, NLDC, ERLDC, GRIDCO and STU (p9–10). GRIDCO estimates State demand across all horizons (p10).
Generation resource planning is led by GRIDCO: mapping contracted, existing and retiring resources; recording machine and technology parameters; computing Capacity Credit, including a net-load approach for wind and solar, hydro water-availability and thermal coal-availability/outage bases; applying Planning Reserve Margin; and identifying resource gaps through scenario analysis (p10–13). State plans are also linked to national LT-NRAP/ST-NRAP and CEA validation (p13–15).
Procurement planning requires GRIDCO to choose an optimal resource mix using least-cost modelling, decide procurement tenure, contract storage, follow competitive-bidding and RE regulations, obtain Commission approval for PPAs/PSAs, share capacity, and handle in-year variations (p15–18). Monitoring and compliance tasks STU/SLDC with communicating state-aggregated shortfalls and leaves non-compliance charges to a Commission special order (p18–19). Roles, data-sharing duties and an annual timelines table are set out (p19–20), along with miscellaneous powers to direct, relax, remove difficulties, amend and interpret (p20–21). Annexure-I supplies the modelling constraints for the RA plan (p22–23).
Read with this
No other documents to read with it are on Voltaic.
One more document belongs here and is not on Voltaic: a draft or notice on a draft.
Voltaic last read OERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (9 pages) and for drafts on 21 Nov 2026. A document OERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of OERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.