RERC · Rajasthan Electricity Regulatory Commission
Standards of Performance for Distribution Licensees Regulations, 2021
Rajasthan Electricity Regulatory Commission (Standards of Performance for Distribution Licensees) Regulations, 2021
RegulationDated 31 Mar 2021Published in the Gazette 15 Apr 2021No. RERC/ Secy. /Reg. 141 dated March 31, 2021
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Rajasthan Electricity Regulatory Commission (Standards of Performance for Distribution Licensees) Regulations, 2021 is a principal RERC regulation that sets service-quality benchmarks for distribution licensees and franchisees in Rajasthan and creates a compensation route for consumers when those benchmarks are missed. It applies to all distribution licensees, including deemed licensees and franchisees, and to all consumers in the state (p36). The notification is dated March 31, 2021 and says the regulations commence on publication in the official gazette (p35); the gazette page header in the extract shows April 15, 2021 (p1).
Regulations 1–16 (pp35–42) cover short title, scope, definitions, objectives, the standards framework, complaint registration and help-desk/customer-care arrangements, compensation claims, licensee reporting and publicity duties, fees, exclusions, consumer-rights preservation, repeal of the 2014 SOP Regulations with savings, and the Commission's powers to remove difficulties, amend and relax.
Schedule I (pp43–48) contains the guaranteed standards of performance: restoration of supply, quality of supply and reliability, meter complaints, shifting of meters/service lines, release of new connections, transfer/change of category, billing complaints, disconnection, restoration of disconnected consumers, and bill delivery. The standards vary by area classification and voltage class. Schedule II (pp48–51) specifies compensation payable for failure against the guaranteed standards, with conditions, caps and bill-adjustment rules. Schedule III (p52) sets overall standards that licensees must seek to achieve. The document also contains SOP-1 to SOP-4 reporting formats (pp52–56) and Annexures I–II (pp57–58) for complaint registers and consumer compensation claims.
Compensation is generally claim-based, with some meter/no-current complaints auto-credited; consumers can escalate unpaid or refused claims to the CGRF and then the Ombudsman (pp39–40). Exclusions cover force majeure, grid/transmission outages and load-despatch-centre-initiated outages (p42).
Read with this
No other documents to read with it are on Voltaic.
Voltaic last read RERC's website for final documents on 24 Nov 2026. A document RERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of RERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.