WBERC · West Bengal Electricity Regulatory Commission
Electricity (Procedure for Previous Publication) Rules 2005
RulesDated 9 Jun 2005G.S.R 387(E) dated 9th June, 2005
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a short Central Government notification, G.S.R 387(E) dated 9 June 2005, making the Electricity (Procedure for Previous Publication) Rules 2005 under s.176(1) and s.176(2)(z) of the Electricity Act, 2003 (p1). It exists to standardise how the Central Electricity Authority (the "Authority") and the Appropriate Commissions must consult before making regulations.
Rule 3 sets out the four-step previous-publication procedure for regulations under s.177(3), s.178(3) and s.181(3) of the Act: the regulator must publish a draft for persons likely to be affected; choose the manner of publication it deems sufficient; publish a notice alongside the draft giving the date on or after which the draft will be considered; and consider objections or suggestions received before that date (p1).
Rule 4 makes publication of the final regulations in the Official Gazette conclusive proof that they were duly made after previous publication (p1). Rule 1 brings the rules into force on Gazette publication; Rule 2 adopts definitions from the Act. The rules are procedural and do not set substantive regulatory content.
Read with this
No other documents to read with it are on Voltaic.
Voltaic last read WBERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document WBERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of WBERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.