GERC · Gujarat Electricity Regulatory Commission
Licensing of Transmission Regulations, 2005
Gujarat Electricity Regulatory Commission (Licensing of Transmission) Regulations, 2005
RegulationDated 29 Mar 2005Notification No. 2 of 2005
Summary
Summary written by software. Check the regulator's original before you rely on it.
Notification No. 2 of 2005 is the GERC regulation that governs how an intra-state transmission licence is applied for, granted, held, amended and revoked in Gujarat (p1–2). Chapter 1 (pp2–6) names the Regulations, extends them to the whole State and brings them into force on Gazette publication, then defines the working vocabulary — Licensed Business, Other Business, Area of Activity, Open Access, Major Incident and the rest — and reserves the Commission's power to review the Regulations, notably to harmonise with open access regulation and to cater to developing power markets.
Chapter 2 (pp7–8) sets the entry test: technical experience in developing, designing, constructing and operating transmission lines or substations at the voltage level of the proposed assets, with experience at 66 kV and above treated as relevant to that band; and financial capability measured as net worth not less than the estimated annual transmission charges, which consortium affiliates may meet collectively.
Chapter 3 (pp8–23) is the procedural spine: the application form, fee and Secretary-addressed filing in six sets; maps, network description, project report, land, personnel, corporate and group-interest details; simultaneous submission to the STU, CD copies and website posting; the STU's time-bound recommendation and its report on whether the assets belong to the intra-state system, form part of the transmission plan, and are technically viable and justifiably costed (its views are not binding); scrutiny by the Secretary; public notice in English and two Gujarati newspapers and public inspection; a one-month objection window; local inquiry; hearing; grant, licence form and duration; deposit and display of maps and licence copies; amendment on application or suo motu; and licence fees with interest, recovery and revocation for default.
Chapter 4 (pp24–43) gives the general conditions attaching to every transmission licence: compliance with the Acts, Grid Code and despatch directions; the Section 40 duties and non-discriminatory open access subject to capacity and cross-subsidy surcharge; prohibited activities (acquiring other licensees, holding interests in distribution, trading or generation, electricity trading, non-transmission use of assets); controls on transferring assets and utilities; ring-fencing, accounting and audit separation, and publicity of accounts for Other Business; information and prudential reporting; Major Incident reporting; the annual Business Plan and investment plan, with Commission permission for Major Investments; the licensee's rights to lay lines; Commission investigation; and the grounds and procedure for revocation. Regulation 33 extends these conditions to deemed licensees (p43). Chapter 5 (pp43–44) carries savings clauses and a power to remove difficulties.
Schedules 1 and 2 (pp45–52) supply the application form with its financial, equity, debt and organisational annexures, and the draft licence format with its project schedule.
Read with this
No other documents to read with it are on Voltaic.
Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of GERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.