Skip to content

RERC · Rajasthan Electricity Regulatory Commission

Demand Flexibility (DF)/Demand Side Management (DSM) Regulations, 2026

Rajasthan Electricity Regulatory Commission (Demand Flexibility (DF)/Demand Side Management (DSM)) Regulations, 2026

RegulationDated 17 Apr 2026Published in the Gazette 15 Jun 2026No. RERC/Secy/ Reg. 165 dated April 17, 2026

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on rerc.rajasthan.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The RERC (Demand Flexibility (DF)/Demand Side Management (DSM)) Regulations, 2026, notified at Jaipur on 17 April 2026 under s.181(2)(zp) of the Electricity Act 2003 read with ss.3, 61, 66 and 86, bind every distribution licensee in Rajasthan, including deemed licensees and successor entities (p31). They take effect from the date of notification in the Rajasthan Gazette; the DFPO obligation in Reg. 3.4.1(c) applies from 1 April 2026, with FY 2026-27 treated as a preparatory load-research and capacity-building year (p31).

Chapter I (Regs 3-4, pp35-39) makes DF/DSM part of day-to-day discom operations, requires a DF/DSM Cell headed by a Chief Engineer, a rolling DF/DSM portfolio in MYT/ARR filings, load research, annual DF/DSM Zones, consumer outreach, an aggregator/consumer/resources digital registry, and SLDC coordination. It sets a multi-year DFPO trajectory as a percentage of peak demand across FY 2026-27 to FY 2029-30 (p37), with incentives and disincentives per MW of over- or under-achievement and no disincentive in the first year. It lists eligible programme types — agricultural pumping, G2V/V2G, behind-the-meter BESS, heat pumps, thermal storage, efficient appliances, TOU/behavioural demand response and aggregator procurement — and excludes fossil-fuel diesel gensets. Aggregators must be registered and separate from IVAs; participation is voluntary unless the Commission mandates otherwise; consumer data is protected under the DPDP Act 2023. Costs are recovered through MYT/ARR subject to prudence check; the Commission may later create a DF-DSM Charge fund (pp39-40).

Chapter II (Regs 5-9, pp40-43) sets the cost-effectiveness screening framework: TRC as the main hurdle, RIM, LRIRIM and supporting PCT/SCT, with NPV formulas, avoided-cost and loss-adjustment methodology, input values and annual revision by the Commission.

Chapter III (Regs 10-18, pp44-46) specifies impact, process and market-effects evaluation, three impact-evaluation approaches, IPMVP Options A-D, deemed savings, large-scale data analysis, IVA empanelment criteria and EMV report contents.

Chapter IV (Regs 19-22, p47) contains difficulty-removal, savings, orders/practice directions and amendment powers. Annexure 1 (pp48-52) gives the DF/DSM plan/DPR and APR formats; Annexure 2 (pp53-54) the PCT and SCT methods; Annexure 3 (pp54-55) IPMVP options.

Standard name
Demand Side Management and Demand Response
Primary topics
Demand-side management and demand response

Read with this

No other documents to read with it are on Voltaic.

Voltaic last read RERC's website for final documents on 24 Nov 2026. A document RERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of RERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on rerc.rajasthan.gov.in ↗

Report an issue with this document