OERC · Odisha Electricity Regulatory Commission
Intra-State ABT Regulations, 2007
Orissa Electricity Regulatory Commission (Intra-State ABT) Regulations, 2007
RegulationDated 17 Dec 2007No.OERC-JD (EA)-264/2006 dated Dated the 17th December, 2007
Replaced by Deviation Settlement Mechanism and Related Matters Regulations, 2025
See that regulation for the date it took effect and for anything it keeps in force.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Orissa Electricity Regulatory Commission's principal regulation creating an availability-based tariff (ABT) regime for the intra-state grid, notified on 17 December 2007 under s.181(2)(zd) and (2)(zp) of the Electricity Act, 2003 (p1). It extends to the whole State of Orissa and takes effect from publication in the Official Gazette — the Gazette date is not printed (p1).
Chapter I (p1–3) fixes the vocabulary — ABT, drawl, injection, intra-state UI rate, intra-state generating station, user, supplier, specified network (state transmission network at 33 kV and above), SLDC and STU — and, more importantly, draws the boundary of who is covered: generators other than those under inter-state ABT, nuclear/wind/solar, run-of-river hydro without storage and plant below 5 MW; distribution and trading licensees drawing largely from ABT-governed sources; open access customers only for the ABT-covered portion of their supply; and HT/EHT consumers with contract demand of 5 MVA or more (p2–3). Applicability is suspended during grid disturbance or islanded operation (p2).
Chapter II (p3–4) sets the three tariff components — capacity charges linked to plant availability, energy charges on scheduled energy, and UI charges for deviations settled against 15-minute block frequency — leaving reactive power compensation to the Orissa Grid Code.
Chapter III (p4–9) is the operating machinery: scheduling and dispatch through SLDC, demonstration of declared capability, anti-gaming limits and consequences, metering and data responsibilities split between STU and DISTCOs, weekly UI/VAr accounts and monthly State Energy Accounts issued by SLDC, and settlement rules including open access over- and under-drawal.
Chapter IV (p9) prohibits banking outright, leaves allocation of erstwhile OSEB/GRIDCO PPAs to the state government, and requires two-part tariffs for all generating stations and DISTCOs. Chapter V (p9–10) carries savings, amendment and difficulty-removal powers. The Appendix (p10–11) is the schedule of frequency-linked UI rates.
Read with this
No other documents to read with it are on Voltaic.
Voltaic last read OERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (9 pages) and for drafts on 21 Nov 2026. A document OERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.