Skip to content

UERC · Uttarakhand Electricity Regulatory Commission

Appointment of Consultants Regulations, 2004

Uttaranchal Electricity Regulatory Commission (Appointment of Consultants) Regulations, 2004

RegulationDated 10 Mar 2004No. 2/2004/UERC-- dated March 10, 2004

1 amendment to it is on Voltaic, dated 5 Dec 2014.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cdnbbsr.s3waas.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Uttaranchal Electricity Regulatory Commission's own internal regulation, notified on 10 March 2004, for engaging outside consultants to do specialised work that the Commission's staff cannot do in-house (p1–2). Regulation 1 gives the short title and makes the regulations effective on Gazette publication; the Gazette date is not printed. Regulations 2–3 define the key terms and set out when and on what basis consultants may be engaged, with terms of engagement drawn up case by case (p2).

Regulation 4 caps how long any assignment may run, and Regulation 5 sorts individual consultants into three bands by years of experience, with power to relax and to prescribe educational qualifications. Regulation 6, read with the Schedule on p5, governs how consultants are paid: a consolidated fee from a scheduled table, a contingency component, and travel/stay reimbursement benchmarked to a Grade A Gazetted Officer of the Government of India (p2–3, p5).

Regulations 7–15 lay out the selection pipeline: terms of reference prepared by an officer and approved by the Commission, budget check by the Secretary, request for proposals, receipt in sealed covers, separate technical and financial evaluation with weighted scoring, negotiation, and fallback to the second-ranked bidder if the selected consultant defaults (p3–5). Single-source selection is allowed in defined exceptional cases, and individual consultants may be chosen on qualifications rather than through competitive bidding (p5). Regulations 16–19 add conflict-of-interest rules and reserve wide powers to the Commission to depart from the prescribed procedure, to amend the regulations, and to remove difficulties (p5).

Standard name
Appointment of Consultants

Read with this

Amendments and corrections

2 more documents belong here and are not on Voltaic: 2 copies in another language.

Voltaic last read UERC's website for final documents on 24 Nov 2026. A document UERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of UERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cdnbbsr.s3waas.gov.in ↗

Report an issue with this document