UPERC · Uttar Pradesh Electricity Regulatory Commission
Promotion of Mini-Grid Renewable Energy Generation and Supply Regulations, 2016
Uttar Pradesh Electricity Regulatory Commission (Promotion of Mini-Grid Renewable Energy Generation and Supply) Regulations, 2016
RegulationDated 6 Apr 2016In force from 10 Apr 2016UPERC/Secy/VCA/Regulations/2016-020 dated 06.04.2016
Summary
Summary written by software. Check the regulator's original before you rely on it.
They are made under section 181 of the Electricity Act 2003, the National Tariff Policy of January 2016 and the UP Mini-Grid Policy 2016, and come into force on 10 April 2016 (p1, p17).
Chapter I sets the vocabulary: mini-grid operator (MGO), mini-grid area, mini-grid renewable energy system, compulsory supply hours, standard of performance, feed-in tariff, distribution franchisee and the associated agreements (pp1–5). Chapter II limits application to new and existing mini-grid projects of up to 500 kWp, giving existing projects six months to comply (p5).
Chapter III is the core commercial design. It lays out two business models — Model A where the licensee's grid does not yet exist, Model B where it does — and, for each, a menu of supply options: sell only to mini-grid consumers, supply consumers and sell surplus to the licensee, or sell everything to the licensee. It also sets out how an MGO migrates between options on grid arrival, and what happens if the licensee buys the distribution network or refuses a power purchase agreement (pp5–8).
Chapters IV to VII are the technical, operational and contractual spine: distribution-network construction standards (with a lighter specification for projects up to 50 kWp), interconnection and metering by reference to CEA regulations, adoption of the feed-in tariff determined under the 2014 CRE regulations, the distribution-franchisee route, billing and energy accounting, RPO treatment and REC pass-through, PPA requirements, and migration and exit procedures (pp8–13).
Chapter VIII assigns duties to the nodal agency, the licensee, the MGO and consumers. Chapter IX constitutes a state-level technical committee to steer implementation and channels disputes to the Commission after a three-month window. Chapter X gives the Commission powers to direct, relax, remove difficulties and amend (pp14–17). Annexure-1 is intended to be the MGO's periodic reporting format, but only its heading appears in the text (p18).
Read with this
No other documents to read with it are on Voltaic.
Voltaic last read UPERC's website for final documents on 24 Nov 2026 (2 pages). A document UPERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of UPERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.