State Grid Code, 2012 — First Amendment, 2012 — Draft

Meghalaya State Electricity Regulatory Commission (State Grid Code) (First Amendment) Regulation 2012

Draft amendmentDated 31 Oct 2022No. MSERC/REGULATION/SGC-2012/2022/163 dated 31st October 2022

Draft

A proposal, not law. Voltaic holds no final regulation made from this draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on mserc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a pre-publication notification issued by the Meghalaya State Electricity Regulatory Commission on 31 October 2022, inviting suggestions within 21 days on a draft set of amendments to the MSERC (State Grid Code) Regulation 2012, which was originally issued on 27 April 2012 (p1). It is the consultation version only: paragraph 1 states that the amending regulations take effect from the date of publication in the Gazette of Meghalaya, so nothing here is in force yet (p1). Suggestions go to the Secretary of the Commission.

Paragraph 2 substitutes Regulation 6.1(1). It restates the rated system frequency, makes the control limits those specified by the Central Electricity Authority or CERC, obliges STU and SLDC to make all possible efforts to hold the grid within a tightened band, and records that the IEGC band was tightened with effect from 17 February 2014 (p1).

Paragraph 3 inserts six new clauses after Regulation 6.2(5), creating a reactive power compensation regime: liability and entitlement to pay or be paid for reactive drawl and injection depending on whether switchyard metering-point voltage falls below or rises above stated percentage thresholds of rated voltage; coverage of open access consumers, constituents, captive power plants and generating stations; SLDC as the agency that computes and serves weekly/monthly reactive energy charges and formulates the computation methodology; SLDC's responsibility for the commercial mechanism and the reactive energy charges pool account; the Varh charge rate to be set by the Commission with the CERC Indian Electricity Grid Code as fallback; and use of the residual pool balance for SLDC operator training and similar works (p2).

Paragraphs 4 and 5 substitute frequency thresholds in Regulation 8.3(4) and Regulation 13.1(2) and 13.1(5), realigning the under-frequency and over-frequency trigger values in those clauses with the tightened frequency band (p2-3).

Standard name
Grid Code
Primary topics
Grid operation and grid code, Power quality, Energy accounting and settlement

Read with this

Voltaic holds no final regulation made from this draft.

No other documents to read with it are on Voltaic.

Voltaic last read MSERC's website for final documents on 26 Nov 2026 and for drafts on 21 Nov 2026. A document MSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on mserc.gov.in ↗

Report an issue with this document