AERC · Assam Electricity Regulatory Commission
MYT Regulations, 2018 for Generation, Transmission, SLDC, Wheeling and Retail Supply
Assam Electricity Regulatory Commission (Terms and Conditions for determination of Multi Year Tariff) Regulations, 2018 for Generation, Transmission, SLDC, Wheeling and Retail Supply
RegulationDated 17 Jul 2018No. AERC. 673/2018/196
Replaced by Terms and Conditions for determination of Multi Year Tariff Regulations, 2021
See that regulation for the date it took effect and for anything it keeps in force.
Summary
Summary written by software, from pages 1 to 23 of 87. Check the regulator's original before you rely on it.
The AERC MYT Regulations, 2018 are Assam’s principal multi-year tariff framework for generation, intra-State transmission, SLDC, distribution wheeling and retail supply. They were made under section 61 read with section 181(2)(zd) of the Electricity Act, 2003 and supersede the 2015 MYT Regulations and amendments (p1). They extend to Assam and apply from 1 April 2019; the first control period runs for three financial years, 1 April 2019 to 31 March 2022, with later three-year blocks possible (p1, p5, p14). Renewable generation is carved out to the 2017 RE regulations, and competitively bid tariffs under section 63 are adopted rather than determined (p2, p12).
Chapter 1 (pp1–12) sets title, extent, applicability and commencement, then defines the terms used across the framework: accounting and allocation statements, capital cost, control period, declared capacity, commercial operation, availability, useful life, prudence check, force majeure and the generating technologies and business segments covered.
Chapter 2 (pp12–22) contains the general principles. It states the objective and scope, directs MYT determination for the specified businesses, and lays out the MYT building blocks: forecast ARR and revenue, capital investment plan, operating norms and performance trajectories, annual performance review, true-up on audited accounts, and sharing of gains and losses. It distinguishes controllable from uncontrollable ARR items and gives separate pass-through mechanics: uncontrollable variations are generally pass-through subject to validation, while controllable gains are shared one-third as rebate and two-thirds retained, and controllable losses are shared one-third and absorbed two-thirds (p21). Regulation 6 requires a control-period Capital Investment Plan with scheme-wise justification, priority ordering and approval conditions (pp14–17). Regulation 9 requires annual review, true-up and tariff filings at least 120 days before year-end (p18). Regulation 10 lists controllable and uncontrollable items in tables (p20).
Chapter 3 (pp22–23) sets the application procedure, fees, formats and Conduct of Business proceedings; provides for end-of-control-period review; and begins generation tariff provisions for existing plants, new plants and distribution-owned generation. Later chapters (4–10) are referenced but not supplied in this extract: Chapter 4 PPA approval, Chapter 5 capital cost, and Chapters 6–10 for generation, transmission, distribution wheeling, retail supply and SLDC tariff terms.
Read with this
No other documents to read with it are on Voltaic.
Voltaic last read AERC's website for final documents on 30 Sep 2026. A document AERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.