CERC · Central Electricity Regulatory Commission
Guidelines for Virtual Power Purchase Agreements
GuidelinesDated 24 Dec 2025No. L-1/257/2020/(PMR-4)/CERC dated 24th December 2025
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Central Electricity Regulatory Commission issues Guidelines for Virtual Power Purchase Agreements, dated 24 December 2025 (p1). They are made under Regulation 54(3) of the CERC (Power Market) Regulations, 2021, after SEBI opined that VPPAs are non-tradable, non-transferable bilateral OTC contracts outside the SCRA and within CERC’s regulatory purview, and after MoP asked CERC to create a framework for VPPAs as NTSD-based OTC contracts to help regulated entities meet RCO compliance (p1–2). They will take effect on a date notified separately by the Commission (p2).
Sections 2 to 4 state the title, applicability to parties entering VPPAs, the scope of describing the statutory framework, and definitions for Commission, Consumer, Designated Consumer, OTC Contracts, Power Exchange, PMR 2021, RCO, RECs, RPO, REGS, REC Regulations, Settlement Price, Trading Licensee, VPPA and VPPA Strike Price (p2–3). A VPPA is defined as an NTSD-based OTC contract between a Consumer or Designated Consumer and a REGS, with guaranteed payment of a mutually agreed VPPA Strike Price, sale of electricity by the REGS through a power exchange or other authorised mode for non-RPO/RCO purposes, and bilateral settlement of the difference between the VPPA Strike Price and the Settlement Price (p3).
Sections 5 to 9 set the essential features and implementation arrangement: electricity sold for physical delivery; RECs transferred to the Consumer or Designated Consumer; the contract is bilateral, non-tradable and non-transferable with a minimum one-year duration; transferred RECs are not tradable; the REGS registers under the REC Regulations; RECs issued to the REGS are transferred to the Consumer for RPO/RCO compliance; certificates are extinguished and recorded, with carry-forward above RPO/RCO; the payment difference is settled bilaterally; and disputes are mutually settled under the contract (p4–5).
Read with this
Commencement notices and reasons
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of CERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.