APERC · Andhra Pradesh Electricity Regulatory Commission
Procurement Investment and Cost Control Regulations, 2026
Regulation No.6 of 2026 APERC Procurement Investment and Cost Control Regulations 2026
RegulationDated 31 Jul 2026Published in the Gazette 3 Aug 2026Lr. No. APERC/Secy/F.No. S-19(Vol-IV)/D.No.682 dated 31-07-2026
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Andhra Pradesh Electricity Regulatory Commission's principal regulation creating a uniform framework for how the State's transmission and distribution licensees plan, procure and account for capital and operational spending that is ultimately recovered through tariff. The Commission's stated reason for making it (p1–2) is that licensees were governed only by internal financial controls, board procedures, State Uniform Procurement Guidelines and the Commission's 2006 investment-approval guidelines, with no single regulation covering procurement, investment approval and expenditure control.
The Preliminary chapter (p2) fixes the title, extends the regulation to the whole State, brings it into force on Gazette publication, and applies it to transmission and distribution licensees for capital investment, procurement of materials, works and related expenditure considered in tariff — with scheme thresholds above Rs. 20 Crores for transmission and above Rs. 5 Crores for distribution. Chapter II (p3–4) defines twenty terms, including approved investment scheme, benchmark cost, capex/opex, DPR, e-procurement, prudence check, schedule of rates, standard bidding document, standard technical specification and a lifecycle "Totex" concept. Chapters III and IV (p5–7) set objectives and guiding principles (planning against CEA planning criteria or Commission-approved criteria) and require each licensee, within three months of commencement, to submit a procurement policy, purchase manual, standard technical and material specifications and standard bidding documents for approval, with prior approval needed for later changes; distribution licensees may pool these. Chapter V (p7) lays down tendering principles — e-procurement, two-part open competitive bidding, non-restrictive conditions, tightly bounded nomination/single-tender exceptions, a bar on artificial splitting, and anti-cartel and conflict-of-interest safeguards.
Chapter VI (p8) requires standardisation and Commission-approved specifications and benchmarking, including annual submission of cost data by 31 December. Chapters VII to IX (p9–11) cover contract and inventory management, website disclosure and Commission audit powers, and the enforcement core: disallowance of imprudent or non-compliant expenditure, capitalisation only of approved-scheme assets, board-level accountability and supplier debarment. Chapter X (p12) gives the Commission powers to issue directions, relax, amend and remove difficulties.
Read with this
Commencement notices and reasons
Earlier drafts
- Dated 22 May 2026Procurement, Investment and Cost Control Regulations, 2026 — Draft
Voltaic last read APERC's website for final documents on 24 Nov 2026 (2 pages) and for drafts on 21 Nov 2026. A document APERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of APERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.