Intrastate Transmission Connectivity and General Network Access Regulations, 2026 — Draft

Maharashtra Electricity Regulatory Commission (Intrastate Transmission Connectivity and General Network Access) Regulation, 2026

Draft regulationReleased with the explanatory memorandum dated 22 Sep 2026No./MERC/Tech/ Transmission Connectivity and GNA/Regulations/........

Draft

A proposal, not law. Voltaic holds no final regulation made from this draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on merc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is MERC's draft of a single consolidated regime for connecting to, and using, the intra-State transmission system in Maharashtra — connectivity, General Network Access (GNA) and Temporary GNA (T-GNA) (p1). It is framed under the Electricity Act, 2003, is stated to take effect on publication in the Official Gazette, and repeals the MERC (Transmission Open Access) Regulations, 2016 with savings (p1, p54). The copy carries a blank notification number and a blank day in 'September 2026', and the text repeatedly calls itself a draft (p1, p7, p55).

Part A (pp1–6) is the definitional base and supplies most of the vocabulary the rest of the document runs on: Lead Generator and Lead ESS aggregation, solar-hour and non-solar-hour access, GNA and Partial GNA consumers, Connectivity Grantee, Associated Transmission System, State Open Access Registry and stranded transmission capacity.

Part B (pp6–9) sets who may apply for connectivity — generating stations including renewables, captive plants, standalone storage, renewable power park developers, distribution licensees, and EHV-level bulk/captive users — at a threshold of 5 MW individually or in aggregate. Renewable applicants must pair connectivity with storage at prescribed ratios of capacity and duration, with a minimum storage-per-MW that steps up in 2030, grandfathering for earlier grants, and a carve-out where generation charges pumped storage (p7). It also names the nodal agencies — STU for connectivity and GNA, SLDC for T-GNA — and the supporting documents applications must carry (pp8–9).

Part C (pp9–27) is the procedural core: online applications and fees, scrutiny and deficiency timelines with fee forfeiture, monthly batching and time-stamp priority, interconnection study and identification of the Associated Transmission System, in-principle grant, the three-part Connectivity Bank Guarantee, final grant, Cat-1/Cat-2 connectivity agreements, quarterly monitoring by the nodal agency, dedicated transmission lines and terminal bays, transfer and splitting of connectivity, return and encashment of guarantees, relinquishment and revocation — including the time-bound conversion of existing solar projects into solar-hour-access entities (p14).

Part D (pp27–32) does the same for GNA: eligibility, deemed GNA tied to existing Base Transmission Capacity Rights under the MYT Regulations and to effective long-term access, an annual cycle for additional GNA, system studies, grant and effective-date rules, lending of GNA to other grantees, and relinquishment notice and charges.

Part E (pp32–39) covers T-GNA: eligibility by buyer, trader and access-category, the SOAR single-window portal, advance and exigency application categories, processing timelines, standing clearance with a deemed-grant default, revisions and the consent mechanics between STU, SLDC and distribution licensees.

The tail parts deal with corridor allocation across GNA, advance T-GNA, collective and exigency transactions (pp39–40); the charge heads payable and exemptions for storage drawing only for charging (pp40–43); scheduling, metering and loss-in-kind (pp43–45); deviation settlement, banking and reactive energy (pp46–48); billing, late payment, default and payment security (pp48–49); mandatory website disclosures (pp49–50); and miscellaneous matters — detailed procedures, curtailment priority, disputes, an Open Access Monitoring and Review Committee, force majeure, exemptions, repeal and savings, and powers to relax and remove difficulties (pp50–55).

Annexures I–VI give application, grant, standing-clearance and payment-schedule formats, and Annexure IV's modalities and worked illustration for sharing a bay between solar-hour and non-solar-hour entities (pp56–84).

Standard name
Connectivity and GNA Regulations, Open Access Regulations
Primary topics
Connectivity and GNA, Open access, Energy storage deployment

Read with this

Voltaic holds no final regulation made from this draft.

No other documents to read with it are on Voltaic.

Voltaic last read MERC's website for final documents on 28 Nov 2026 (8 pages) and for drafts on 28 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.