CERC · Central Electricity Regulatory Commission
Modified Composite Index for Imported Coal — Payment Purposes
Development of Modified Composite Index for Imported Coal for Payment Purposes
Draft procedureReleased with the notice dated 18 Jun 2013
Draft
A proposal, not law. Voltaic holds no final regulation made from this draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This document sets out CERC's methodology for computing escalation rates for imported steam coal, distinguishing the separate approaches used for bid evaluation and for payment purposes. It explains that escalation rates are notified under the Ministry of Power's 19 January 2005 bidding guidelines and that imported coal is handled through a composite price index plus a computation methodology (p1).
Sections 1.1–1.2 describe the existing arrangements: for payment, CERC has used a composite index built from API4, Barlow Jonker/Coalfax and GlobalCOAL; for bid evaluation, only Barlow Jonker/Coalfax is used because the statistical model needs a long time series. Payment escalation is computed from the difference between the first and last six months' average index values, while bid evaluation uses a linear time-series model developed with ISI Kolkata (pp1–2).
Section 1.3 gives the reason for review: Indonesian coal now dominates Indian steam coal imports and Platts publishes an Indonesian coal price index; producers requested its inclusion. Section 1.4 proposes to keep Barlow Jonker/Coalfax for bid evaluation because Indonesian, API4 and GlobalCOAL series are too short. Section 1.5 proposes the modified composite index for payment purposes: adding Platts Indo Coal, assigning weights among Indonesian, South African and Australian indices, harmonising calorific values from GAR to GAD and normalising to a common kcal/kg basis, retaining the Australian index, and allowing periodic review when another country reaches a stated import share and a reliable index exists (pp2–4). Section 1.6 works through an example using March 2012–February 2013 data, with the revised index applicable from April 2013 in the example, and Tables 1–2 compare current and proposed escalation results (pp4–6).
Appendix A reproduces the consultant's reasoning for the original hybrid index and index choices (pp7–8). Appendix B tabulates steam coal imports into India by country for 2010-11 to 2012-13 (pp9–10). The document is a methodology/proposal rather than a numbered regulation and states no formal issue date or Gazette reference.
Read with this
Voltaic holds no final regulation made from this draft.
Proposed changes (drafts with no final yet)
- Dated 18 Jun 2013Public notice: Development of Modified Composite Index for Imported Coal for Payment Purposes, 2013 — Public Notice
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.