Skip to content

BERC · Bihar Electricity Regulatory Commission

Capital Investment and Capitalisation Plan Filing Procedure Regulations, 2017 — Consultative Paper — Draft

Consultative Paper for making Bihar Electricity Regulatory Commission (Procedure for filing Capital investment and Capitalisation plan) Regulations, 2017

Draft regulationDated 1 Dec 2017Notice No...35..... dated 01/12/2017

Draft

A proposal that has since been finalised as the Capital Investment and Capitalisation Plan Filing Regulations, 2018.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on berc.co.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

Pages 1–4 are a consultation package. The public notice on page 1 announces that the Bihar Electricity Regulatory Commission has started suo-motu proceedings to make two sets of draft regulations — the BERC (Procedure for filing Capital Investment and Capitalisation Plan) Regulations, 2017 (Suo-Motu Proceeding No. 35/2017) and the BERC (Rooftop Solar Grid Interactive Systems Based on Net and Gross Metering) Regulations, 2017 (No. 36/2017) — and invites comments and objections by 05.01.2018, with a hearing on 9 January 2018 at 11:00 A.M.

The consultative paper at pages 2–4 explains the gap being filled: the BERC Multi Year Distribution Tariff Regulations, 2015 require a capital investment plan only for a control period from distribution licensees, and the 2007 tariff regulations for intra-state transmission licensees require none at all (p3). It cites the Tariff Policy, 2016, including Para 8 on ensuring adequate and uninterrupted supply to all consumers by 2021-22, and concludes that both distribution and intra-state transmission licensees need a long-term rolling plan — say ten years — for capacity addition and system strengthening (pp2–3). Comments are invited to the Secretary by 5 January 2018 and a public hearing is announced (p4).

Pages 5–10 carry the draft regulations. Regulation 1 gives the title, extent and commencement; Regulation 2 defines terms; Regulation 3 applies the regulations to all transmission and distribution licensees in Bihar (pp6–7). Regulation 4 requires each licensee to assess its infrastructure requirement against the forecast demand and energy requirement (pp7–8). Regulation 5 prescribes what the ten-year rolling capital investment plan must contain — scheme-wise objectives, cost-benefit analysis, funding sources and a least-cost approach (pp8–9). Regulation 6 makes the plan an integral part of the annual ARR/MYT filing and sets out the submission contents, DPR conditions, scrutiny and approval process, and a prior-approval rule for every capital investment with emergency-investment exceptions (pp9–10). Regulations 7 and 8 give the Commission powers to remove difficulties and to amend (p10).

Standard name
Capital Investment Approval
Primary topics
Capital cost and investment, Network planning and investment, ARR and true-up

Read with this

Voltaic last read BERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document BERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on berc.co.in ↗

Report an issue with this document