PSERC · Punjab State Electricity Regulatory Commission
Engagement of Consultants Regulations, 2012
The Punjab State Electricity Regulatory Commission (Engagement of Consultants) Regulations, 2012
RegulationDated 16 Aug 2012No. PSERC/Secy/Regu.71 dated The 16th August, 2012
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Punjab State Electricity Regulatory Commission's own procurement rulebook for hiring consultants, issued as Notification No. PSERC/Secy/Regu.71 dated 16 August 2012 under s.91(4) read with s.181 of the Electricity Act, 2003 (p1). It governs only the Commission's internal engagement of outside expertise — it does not regulate licensees, tariffs or consumers.
Regulation 1 gives the short title and commencement: in force from publication in the Punjab Gazette (date not printed). Regulation 2 defines the Act, Commission, Consultant, Consultancy Evaluation Committee (CEC), Officer, Secretary and Secretariat (p1). Regulation 3 lists the purposes for which consultants may be engaged — expert advice, studies and benchmarking, tasks needing specialist experience, and general assistance to the Commission — states that the engagement period is whatever the Commission decides, and has the Commission constitute a CEC to evaluate bids (p1–2).
Regulation 4 creates three categories — corporate, individual and staff consultants — each tied to a different justification (p2–3). Regulation 5 then sets a separate selection procedure for each: TOR approval, combined or separate technical and financial bids, minimum technical qualifying marks, RFP publicity through two national newspapers and an approved panel for corporate consultants; website plus two-newspaper notices with at least two weeks to apply, and qualification/experience-based evaluation, for individual and staff consultants (p3–4). A proviso allows single-source engagement in urgent cases where the fee does not exceed a stated ceiling (p4). Regulation 6 describes what each category's scope of work covers and requires the TOR to specify tasks, timelines, surveys, outputs and deliverables, with a Model Contract at Annexure I (p4–5).
Regulations 7–13 set conflict-of-interest bars, obligations and liability (including force majeure and 'material breach' triggers), confidentiality, Commission ownership of IP, duty of care and performance standards, termination (with different notices for corporate versus individual/staff consultants), and arbitration by a person nominated by the Commission under the Arbitration and Conciliation Act, 1996 (p5–8). Regulations 14–16 preserve the Commission's power to relax, to depart from its own procedure, and to amend. Regulation 17 repeals the 2005 Engagement of Consultants Regulations and saves acts done under them (p9).
Annexure I (pp10–14) is a fill-in-the-blanks Model Contract embedding Schedules A–E (scope of work, personnel, services and deliverables, training, and payment) and restating the key obligations.
Read with this
No other documents to read with it are on Voltaic.
Voltaic last read PSERC's website for final documents on 26 Nov 2026. A document PSERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of PSERC's website on 26 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.