BERC · Bihar Electricity Regulatory Commission
Bihar Multi Year Distribution Tariff Regulations, 2018 — Draft
Bihar Electricity Regulatory Commission (Multi Year Distribution Tariff) Regulations 2018
Draft regulationDated 1 Jun 2018
Draft
A proposal, not law. Voltaic holds no final regulation made from this draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the draft Bihar Electricity Regulatory Commission (Multi Year Distribution Tariff) Regulations, 2018. The notification says the Commission makes the Regulations under the Electricity Act, 2003 for a multi-year tariff framework for distribution licensees in Bihar (p4). It is to come into force on Gazette notification, and its tariff-determination provisions apply from 1 April 2019 up to FY 2022 (31 March 2022) or until amended (p4). It applies to all distribution licensees where the Commission determines cost-based/ARR tariff (p4).
Part I (pp4–7) sets the title, commencement, extent, scope and definitions. Part II (pp7–11) establishes the MYT framework: control period, business plan, forecast, performance trajectory, annual review and true-up, and the treatment of controllable and uncontrollable factors, including pass-through and sharing of gains and losses. Part III (pp11–15) lays out the filing and approval procedure: business plan and tariff applications, admission, public notice, tariff order, publication, true-up and annual performance review, and adherence to the tariff order. Part IV (pp15–23) covers sales forecasting, unmetered and agricultural sales studies, AT&C loss targets and formula, power purchase quantum and cost, and the monthly fuel and power purchase cost adjustment (FPPCA) mechanism. Part V (pp23–32) sets financial principles for the ARR — O&M norms, depreciation, contingency reserve, loans and finance charges, IDC/IEDC, working capital, return on equity, tax gross-up, bad debts, non-tariff income, other business income and regulatory assets. Part VI (pp32–37) deals with segregation of wheeling and retail supply business, availability targets and incentives, subsidy, cross-subsidy and cost-to-serve allocation, open access surcharge, tariff design and time-of-day tariffs. Part VII (p37) contains amendment, difficulty-removal, variation and repeal-and-savings provisions; it repeals the 2015 MYT Distribution Tariff Regulations with savings for prior-period proceedings. The appended formats (pp38–97) are 41 petition formats covering sales, power purchase, expenses, assets, loans, ARR, revenue, subsidy, voltage-wise cost and tariff schedules.
Read with this
Voltaic holds no final regulation made from this draft.
No other documents to read with it are on Voltaic.
Voltaic last read BERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document BERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.