Skip to content

UERC · Uttarakhand Electricity Regulatory Commission

Procedure for Accreditation of RE Generation Projects for REC by State Agency

PROCEDURE FOR ACCREDITATION OF RENEWABLE ENERGY GENERATION PROJECT FOR RENEWABLE ENERGY CERTIFICATE BY STATE AGENCY

ProcedureDate not stated

Made under the Compliance of Renewable Purchase Obligation Regulations, 2010.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cdnbbsr.s3waas.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Uttarakhand Electricity Regulatory Commission's procedure, framed through UREDA as the designated State Agency, for accrediting renewable energy generation projects that wish to participate in the Renewable Energy Certificate (REC) mechanism. It gives effect to the UERC (Compliance of Renewable Purchase Obligation) Regulations, 2010, particularly Regulations 5, 6, 8 and 9 (p1). The document is a process manual rather than a tariff order.

It applies to eligible RE generating companies, obligated entities (distribution licensees, captive users and open access consumers in Uttarakhand) and the agencies involved in accreditation (p2–3). Accreditation may be sought online at www.recregistryindia.in and in physical form not earlier than six months before proposed commissioning; existing projects not tied up in long-term PPAs can apply when they choose (p3). An accreditation certificate is valid for five years unless revoked (p3).

Section 4 sets out six steps: application, acknowledgement, scrutiny within five working days, deficiency removal, grant of certificate and payment of charges, and intimation to the Central Agency, SLDC, distribution licensee and STU (p3–7). Section 5 assigns roles to the RE generator, distribution/transmission licensees and STU, SLDC and the State Agency, including metering, energy accounting and monitoring (p7–11). Sections 6 to 8 cover the application format, the accreditation certificate format and fees, with amounts left for the Commission to determine from time to time (p11–13). Section 9 lists events of default — non-payment, non-compliance, signing a preferential-tariff PPA after accreditation — and the revocation process (p13–14). Section 10 allows the State Agency to propose amendments to remove difficulties with Commission approval (p14).

Annexures provide the RPO reporting forms, the detailed online application sections A–I, the declaration, the certificate format and a document checklist (p15–30).

Standard name
RPO Regulations, REC Regulations
Primary topics
Renewable energy certificates (REC), Renewable purchase obligation (RPO / RCO), Energy accounting and settlement

Read with this

Amendments and corrections

2 more documents belong here and are not on Voltaic: 2 copies in another language.

Voltaic last read UERC's website for final documents on 24 Nov 2026. A document UERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cdnbbsr.s3waas.gov.in ↗

Report an issue with this document