TSERC · Telangana State Electricity Regulatory Commission
Gazette notification of Regulation 2 of 2023
RegulationDated 30 Dec 2023Published in the Gazette 30 Dec 2023No. 245-A dated DECEMBER 30, 2023
Summary
Summary written by software. Check the regulator's original before you rely on it.
Page 1 is the Telangana Gazette masthead — Part II Extraordinary, No. 245-A, Hyderabad, Saturday, 30 December 2023 — carrying the notification heading "TSERC-SECY- PRINTING OF FINAL REGULATION APPROVED BY THE COMMISSION" (p1). Pages 110 and 293 carry only the authentication of the Commission Secretary, V. Ramchander, dated 30.12.2023 (p110, p293).
The catalogue description of it as "Gazette notification of Regulation 2 of 2023" is not corroborated anywhere in the text.
Read with this
No other documents to read with it are on Voltaic.
Voltaic last read TSERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document TSERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of TSERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.