Skip to content

WBERC · West Bengal Electricity Regulatory Commission

Electricity Act, 2003

the Electricity Act, 2003

ActDated 26 May 2003Published in the Gazette 2 Jun 2003No.36 of 2003 dated 26th May, 2003

1 amendment to it is on Voltaic, dated 28 May 2007.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on wberc.gov.in ↗

Summary

Summary written by software, from pages 1 to 40 of 134. Check the regulator's original before you rely on it.

The pages are the opening of the Electricity Act, 2003, a consolidating statute for generation, transmission, distribution, trading and use of electricity (p1). It is published by the Ministry of Law and Justice, records assent on 26 May 2003 and publication on 2 June 2003, and extends to the whole of India except Jammu and Kashmir; commencement is by Central Government notification, with different dates possible for different provisions (p1).

Part I (pp1–10) sets short title, extent, commencement and a long definitional dictionary covering institutions, licences, network terms, open access, wheeling, captive generation, repealed laws and grid instruments. Part II (pp11–12) requires national electricity and tariff policy, a National Electricity Plan, and policies for rural stand-alone systems and rural electrification/local distribution.

Part III (pp13–15) exempts generating companies from licensing subject to grid technical standards, provides for Authority concurrence on large hydro schemes, captive generation and dedicated transmission lines, duties of generating companies, and emergency directions. Part IV (pp16–26) governs licensing: who must hold a licence, exemptions, application and public objection procedure, deemed licensees, licence duration/conditions, amendment, revocation, sale of utility, directions and suspension of distribution licences.

Part V (pp27–37) deals with transmission: regional demarcation, National, Regional and State Load Despatch Centres and their functions, direction-compliance and penalties, Grid Standards, intervening transmission facilities, Central and State Transmission Utilities, and open access with cross-subsidy surcharge. Part VI begins at p38 with distribution licensee duties and open access; it sets phased State Commission open access, a five-year deadline for consumers above 1 MW, wheeling and surcharges, grievance forums and Ombudsman, duty to supply, exceptions, and recovery of charges.

Standard name
Electricity Act, 2003
Primary topics
Licensing and licence conditions, Tariff determination, Open access

Read with this

Amendments and corrections

Voltaic last read WBERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document WBERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of WBERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on wberc.gov.in ↗

Report an issue with this document