Skip to content

MPERC · Madhya Pradesh Electricity Regulatory Commission

Procedure for Filing Appeal before the Appellate Authority Regulations, 2004

Madhya Pradesh Electricity Regulatory Commission (Procedure for filing appeal before the Appellate Authority) Regulations 2004

RegulationDated 17 Sep 2004No.2385/MPERC/2004

2 amendments to it are on Voltaic, the latest dated 19 Jan 2024.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on mperc.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is MPERC's procedural regulation for appeals against a final assessment order made under section 126 of the Electricity Act 2003 (p1). It is a short, self-contained instrument: five regulations plus a prescribed appeal form. The Commission made it under section 127 read with section 181(2)(zo) of the Act (p1).

Regulation 1 gives the title, extends the regulation to the whole State of Madhya Pradesh, and states that it comes into force on the date of publication in the Madhya Pradesh Gazette — no Gazette date is printed in the text (p1). Regulation 2 defines the Act, the Appellate Authority (the authority prescribed by the Central Government under section 127(1) read with section 176(2)(u)), the Commission, and "month", with a residual rule that undefined expressions take their Act or industry meaning (p1).

Regulation 3 is the core: an aggrieved person may appeal a final section 126 order within 30 days, in the form given in the Schedule, signed and verified on non-judicial stamp paper, accompanied by a graded ad valorem fee with a floor that depends on the assessed amount (p1–2). Fee payment form is left to the Appellate Authority to specify (p2).

Regulation 4 imposes a quarterly reporting duty on distribution licensees: they must tell the Commission, within one month of quarter-end, how many appeals are pending, newly filed, disposed of and undecided, broken down by age of pendency and by level of Appellate Authority notified by the State Government (p2). Regulation 5 lets the Commission issue orders and practice directions and amend the regulations (p2).

The Schedule (pp3–4) is the fill-in-the-blanks memorandum of appeal and verification: parties, grounds, value of appeal and fee particulars, confirmation that the order was not passed by consent, proof of the one-third deposit paid to the licensee under section 127(2), prayer, and a list of enclosures (p3–4).

Standard name
Appeal Procedure (Appellate Authority)
Primary topics
Appeals to the appellate authority, Fees payable to the Commission

Read with this

4 more documents belong here and are not on Voltaic: 3 copies in another language and 1 corrigendum not held as English text.

Voltaic last read MPERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (4 pages). A document MPERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of MPERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on mperc.in ↗

Report an issue with this document