MoPOrderIssued 10 Jun 2025National jurisdiction

Waiver of Inter-State Transmission Charges for Energy Storage Systems (ESS)

mop-order-FY26-001
Voltaic record IDc11ee0f1-6f76-4c61-916d-dcb42a7c3b87
Metadata human-verified

F.No.12/07/2023-RCM- Part(1) Government of India Ministry of Power (RCM Division)

F-201, Nirman Bhawan, New Delhi

Dated the 10th June, 2025

ORDER

Subject: Waiver of Inter-State Transmission Charges for Energy Storage Systems (ESS) - reg.

This is in continuation to the Ministry of Power Orders No. 23/12/2016 R&R dated 23.11.2021, 30.11.2021, 01.12.2022, 06.12.2022 and Order No.12/07/2023-RCM dated 29.05.2023 & 09.06.2023 regarding the waiver of Inter-State Transmission (ISTS) Charges on transmission of the electricity generated from Renewable Energy (RE) sources, Energy Storage Systems (ESS) and Green Hydrogen/ Green Ammonia.

  1. In partial amendment to above orders following provisions are being made with respect to Hydro PSP and Battery Energy Storage System (BESS) Projects:

a) ISTS charges waiver for Hydro PSP Projects for which the construction work has been awarded on or before 30th June 2028 shall be 100%.

b) ISTS charges waiver for co-located Battery Energy Storage System (BESS) Projects commissioned on or before 30th June, 2028 shall be 100%, if the power from such BESS projects is consumed outside of the state, where such BESS project is commissioned.

Provided that a BESS project shall be considered as co-located, if the BESS and RE projects are connected at the same ISTS sub-station.

c) There will not be any ISTS charges waiver for Hydro PSP Projects, for which the construction work awarded after 30th June, 2028 and for co-located BESS commissioned after 30th June, 2028.

d) For BESS projects which are not co-located, the ISTS charges waiver shall be as per the extant orders issued by the Ministry of Power and CERC Regulations.

  1. This issues with the approval of Minister of Power and Housing & Urban Affairs.


10/6/25

(Sunil Kumar Sharma)
Director (RCM, NRE)
Tel: 011-2306 2914

To:

Secretary, Central Electricity Regulatory Commission, New Delhi

Copy to:

  1. Secretary, MNRE, New Delhi.
  2. Chairperson, Central Electricity Authority, New Delhi
  3. Secretary in charge, Power / Energy Dept., State Governments/UTs.
  4. Secretary, State Electricity Regulatory Commissions / Joint Electricity Regulatory Commissions.

Copy for information to:

  1. PS to Minister for Power and Housing & Urban Affairs
  2. APS to Minister of NRE and Consumer Affairs, Food and Public Distribution.
  3. APS to MoS Power & NRE.
  4. PPS to Secretary (Power) / PPS to AS (SN) / Sr PPS to AS (AT) / PPS to AS (PS)
  5. Joint Secretaries/ Chief Engineers/ Economic Adviser, Ministry of Power.
Text depth: editor-reviewed markdown. This rendering aids reading and search; the official PDF remains the artifact of record.
View Original Document
Trust — five dimensions
1 · StandingIn force
2 · SourceOfficialcdnbbsr.s3waas.gov.in
3 · ReviewMetadata + links
4 · Text depthReviewed
5 · CollectionPublished
Lineage
This document
ISTS Waiver ESS
No linked documents in corpus
Record details
Doc codemop-order-FY26-001
TypeOrder
JurisdictionNational
Primary domainEnergy Storage
Issued10 Jun 2025
Validity endnot set (in force)
Published29 Jun 2026
Tags
All entities using Inter-State TransmissionGenerating CompaniesCentral Electricity Regulatory CommissionElectricity Act 2003Transmission ChargesInter-State Transmission ChargesEnergy Storage Systems (ESS)Renewable Energy (RE) sourcesEnergy Storage Systems