MPERC · Madhya Pradesh Electricity Regulatory Commission
Pension and Terminal Benefits Liabilities of Personnel of the Board and Successor Entities Regulations, 2012
Madhya Pradesh Electricity Regulatory Commission (Terms and Conditions for Allowing Pension and Terminal Benefits Liabilities of Personnel of the Board and Successor Entities) Regulations, 2012 (G-38 of 2012)
RegulationDated 20 Apr 2012No. 1191/MPERC/2012
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a principal MPERC regulation made under the Electricity Act, 2003 and the Madhya Pradesh Vidyut Sudhar Adhiniyam, 2000 to allow pension and terminal benefit liabilities of Madhya Pradesh State Electricity Board personnel and successor entities to be recovered through tariff (p5). The preamble records the Transfer Scheme Rules, 2003, a combined petition by successor entities, and the Commission's direction to delink pension matters from tariff regulations (p5–6). It comes into force on publication in the Madhya Pradesh Official Gazette, with tariff effect only from the financial year following publication; the Gazette date is not printed (p6). It applies to personnel and existing pensioners as defined in the Transfer Scheme Rules, including those as on 1.6.2005 (p6). Regulation 2 defines the Board, pensioner, personnel, successor entities and terminal benefits (p6–7). Regulation 3 is the core: it classifies pension liabilities into annual cash outflow, trust fund contributions for past service up to 31.5.2005, and year-on-year contributions for service from 1.6.2005, all based on actuarial analysis by Madhya Pradesh Power Transmission Company Limited; it routes liabilities of existing pensioners and of Board/MP Power Management Company personnel through the Madhya Pradesh Power Transmission Company Limited tariff, allocates others to the respective successor entities, subjects amounts to prudence check and truing up, caps contribution allowances to what the Commission decides in tariff orders after assessing financial and retail tariff impact, and ends cash-outflow funding once the trust is fully funded (p7–9). Regulation 4 makes Madhya Pradesh Power Transmission Company Limited the nodal agency (p9–10). Regulations 5 and 6 give the Commission powers to remove difficulties and amend the regulations (p10). Pages 1–2 survive only as fragments.
Read with this
No other documents to read with it are on Voltaic.
One more document belongs here and is not on Voltaic: a copy in another language.
Voltaic last read MPERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (4 pages). A document MPERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of MPERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.