Summary written by software. Check the regulator's original before you rely on it.
The Odisha Electricity Regulatory Commission made these regulations by notification No. 771--OERC/RA/MINI GRID REG. 18/2016 dated 10 June 2019, published in the Odisha Gazette on 29 July 2019 (p1). They create a framework for renewable-energy mini-grids in Odisha — generation-and-supply projects of more than 10 kW and up to 1000 kW (p3) — serving un-electrified census villages, hamlets, padas, bastis and underserved areas.
Part I gives the short title, statewide extent, objective and the definitions that carry the rest of the document (pp1–4). Part II makes the regulations apply to new and existing projects, giving existing ones six months from notification to meet the technical and safety standards (p4). Part III sets out two business models — Model A where the licensee's system does not exist, Model B where it pre-exists — and the options open to an operator when the grid arrives: keep supplying consumers, sell only surplus to the licensee, or sell all output and take on the distribution-franchisee role (pp4–5). Part IV specifies construction and safety standards for the operator's distribution network, interconnection with the licensee's system, metering, the power purchase agreement, the franchisee framework, and migration and exit routes (pp5–7). Part V is the commercial framework: the Commission determines the feed-in tariff under Section 62 on the operator's application, and it covers energy accounting and settlement with consumers, with the licensee, and for franchisee operations, plus treatment of mini-grid generation toward RPO (pp7–8). Part VI assigns duties to the State Nodal Agency, distribution licensee, MGO, GRIDCO and consumers (pp8–10). Part VII creates a state-level Technical Committee and a tiered dispute route (pp10–11). Part VIII gives the Commission powers to direct, relax, remove difficulties and amend (p11). Annexure-1 is the operator's reporting format (p12).
Read with this
No other documents to read with it are on Voltaic.
Voltaic last read OERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (9 pages) and for drafts on 21 Nov 2026. A document OERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of OERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.