UERC (Terms and Conditions for Determination of Multi Year Tariff) (First Amendment) Regulations, 2022

uerc-regulation-FY23-001
Voltaic record IDc43859e1-3abe-419b-bcfb-65803f3f331d
Metadata human-verified

4f0©4T-UA/DO/DDN/30/2021-2023

Uttarakhand Electricity Regulatory Commission

Notification

May 12, 2022

No. F-9(32)(I)/RG/UERC/2022/213: In exercise of powers conferred under Section 61 read with Section 181 of the Electricity Act, 2003 and in pursuance to Clause 5.3 of the Tariff Policy, 2016 and all other powers enabling it in this behalf, the Uttarakhand Electricity Regulatory Commission hereby makes the following regulations to amend the Uttarakhand Electricity Regulatory Commission (Terms and Conditions for Determination of Multi Year Tariff) Regulations, 2021 (hereinafter referred to as "the Principal Regulations"), namely:

1. Short title and commencement

  1. These regulations may be called the Uttarakhand Electricity Regulatory Commission (Terms and Conditions for Determination of Multi Year Tariff) (First Amendment) Regulations, 2022.

Publication in the Official Gazette

Amendment to Regulation 2 of the Principal Regulations

Generating Stations and Transmission System whose tariff has been discovered through a transparent process of competitive bidding in accordance with the competitive bidding guidelines notified by the Central Government and adopted by the Commission under Section 63 of the Act.

Amendment to Regulation 58 of the Principal Regulations

Provided that all the new Intra-State transmission system costing above a threshold limit and meeting other conditions as laid out in Appendix-VI shall be developed through Tariff Based Competitive Bidding.

Appendix-VI

(Threshold Limit for Intra-State Transmission System developed through Tariff Based Competitive Bidding)

[Refer to Proviso of Regulation 58(1)]

The Commission considering the suggestions received on Consultation Paper on Determination of Threshold Limit for development of Intra-State Transmission System through Tariff Based Competitive Bidding hereby determines the threshold limit of Rs. 100 Crore (Rupees One Hundred Crore) above which all Intra-State Transmission System (new and augmentation) costing Rs. 100 Crore shall be developed through Tariff Based Competitive Bidding in accordance with the competitive bidding guidelines notified by the Central Government from time to time.

This threshold limit shall be applicable for all new Intra-State Transmission System (Projects) for which approval is yet to be accorded by the Commission.


Commission for the same.

By Order of the Commission,

NEERAJ SATI,

Secretary,

Uttarakhand Electricity Regulatory Commission.

Text depth: editor-reviewed markdown. This rendering aids reading and search; the official PDF remains the artifact of record.
View Original Document
Trust — five dimensions
1 · StandingIn force
2 · SourceOfficialcdnbbsr.s3waas.gov.in
3 · ReviewMetadata + links
4 · Text depthReviewed
5 · CollectionPublished
Lineage
This document
UERC (Terms and Conditions for Determination of Multi Year Tariff) (First Amendment) Regulations, 2022
No linked documents in corpus
Record details
Doc codeuerc-regulation-FY23-001
TypeRegulation
JurisdictionState · UK
Primary domainTariff & Pricing
Issued12 May 2022
Validity endnot set (in force)
Published25 Jul 2026
Tags
MYT regulation tariff determination - 2021