SSERC · Sikkim State Electricity Regulatory Commission
Procedure for Accreditation of Renewable Generation Project for REC Mechanism Regulations, 2022
Sikkim State Electricity Regulatory Commission (Procedure for Accreditation of Renewable Generation Project for REC Mechanism) Regulations, 2022
RegulationDated 20 Jul 2022Published in the Gazette 27 Jul 2022No.391/SSERC/2022-23/168 dated 20th July 2022
Summary
Summary written by software. Check the regulator's original before you rely on it.
SSERC makes the procedure by which a renewable energy generating company in Sikkim gets accredited by the State Agency so that it can participate in the national Renewable Energy Certificate (REC) mechanism (p1). The regulations come into force on the date of their publication in the Sikkim Official Gazette and extend to the whole State (p1).
Regulation 2 defines the vocabulary of the REC chain — Central Agency, CERC REC Regulations, Certificate, Eligible Entity, floor and forbearance price, obligated entity, Power Exchange, State Agency and REC — and imports undefined terms from the Act and the Commission's other regulations (p1–2). Regulation 3 designates the State Load Despatch Centre as the State Agency and lists its functions: scrutinising and independently verifying accreditation applications, recommending registration or rejection, extending, revoking and intimating accreditation to named bodies, and monitoring and reporting RPO compliance by obligated entities; the Commission may replace the State Agency by order (p2–3).
Regulations 4 and 5 set the accreditation application route — owner, operator, station, connectivity, metering and clearance details in Form-1.1 to 1.4 with a signed declaration, leading to a Certificate of Accreditation in Form-2 (p3–4, pp7–11). Regulation 6 fixes the processing timelines and the revalidation, change-of-status and change-of-name steps (p4). The fee schedule for application processing, accreditation, annual charges and revalidation sits at regulation 7 (p5). Regulation 8 defines events of default, the notice and 14-day cure process, revocation and the onward intimation duties (p5–6). Regulations 9 and 10 give the Commission power to amend the regulations and general/residual powers to remove difficulties (p6).
Read with this
No other documents to read with it are on Voltaic.
Voltaic last read SSERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 21 Nov 2026. A document SSERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of SSERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.