Skip to content

GERC · Gujarat Electricity Regulatory Commission

Fixation of Trading Margin Regulations, 2010

Gujarat Electricity Regulatory Commission (Fixation of Trading Margin) Regulations, 2010

RegulationDated 16 Feb 2010Notification No. 1 of 2010 dated 16th February 2010

1 amendment to it is on Voltaic, dated 9 Dec 2011.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on gercin.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a short, two-page principal regulation by the Gujarat Electricity Regulatory Commission capping what a trading licensee may charge for electricity traded inside Gujarat. It is made under s.86(1)(j) read with s.181 of the Electricity Act, 2003 (p1) and was signed by order of the Commission at Ahmedabad on 16 February 2010 (p2).

Regulations 1 to 3 (p1) give the short title, state that the regulations apply to any person engaged in electricity trading within the State of Gujarat, and provide that they come into force from the date of publication in the official Gazette. The Gazette date is not printed, so the exact date of effect cannot be fixed from this text.

Regulation 4 (p1) is the operative provision: an intra-state trading margin ceiling of 4 paise/kWh on electricity traded, inclusive of all charges except the charge for scheduling energy and open access. The Explanation to that regulation states what open access charges comprise — transmission charge, operating charge and application fee.

Regulations 5 and 6 (p2) are machinery clauses: the Commission may add, vary, modify, delete or amend any provision at any time, and may remove difficulties by general or specific order consistent with the Act.

There are no definitions section, no penalty provision, no review or sunset clause, and no repeal or savings of earlier instruments. For an analyst the document matters only as the source of the state-level trading margin cap and the scope of its exclusions.

Standard name
Trading Margin
Primary topics
Electricity trading and trading margin

Read with this

Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of GERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on gercin.org ↗

Report an issue with this document