HERC · Haryana Electricity Regulatory Commission
Smart Grid Regulations, 2016
Haryana Electricity Regulatory Commission (Smart Grid), Regulations, 2016
RegulationDated 25 May 2016Regulation No. HERC/ 33 /2016 dated The 25th May, 2016
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Haryana Electricity Regulatory Commission issued these regulations on 25 May 2016 under s.181(2)(zp) of the Electricity Act, 2003, to create a framework for smart grid planning, approval, execution and evaluation across the State grid (p1, p3). They come into force from the date of publication in the Haryana Government Gazette; no Gazette date is printed (p1).
Chapter I sets the title, commencement and extent, binding generating companies, transmission and distribution licensees and consumers connected to the Haryana State grid, and defines the vocabulary the rest of the regulation uses — AMI/smart meters, aggregators, cyber security, electric energy storage, interoperability, KPIs, microgrids, smart grid and WAMS (p1–2).
Chapter II states the objectives (economy, efficiency, network security, renewable and microgrid integration) and lets the Commission issue guidelines on programme formulation, implementation, cost-effectiveness assessment, monitoring, customer engagement, data protection, training and funding methodology, without making such guidelines a precondition for filing a plan (p3).
Chapter III requires every transmission and distribution licensee to constitute a Smart Grid Cell within three months of notification, with baseline study, plan formulation, approval-seeking, implementation and measurement duties, which may be merged with energy efficiency and demand side management work (p4).
Chapter IV is the operative process: baseline study and database building, a Multi-Year Smart Grid Plan filed with the MYT/ARR petition, prior Commission approval for projects above the stated investment threshold, prescribed contents of the project proposal, indicative tariff design options such as critical peak pricing and real-time pricing, and a cross-reference to Schedule-X (p4–6). Approval conditions, incentives/disincentives, cost-recovery methodology, execution standards (CEA, then Commission, then BIS, then IEC/IEEE/ANSI) and consumer data protection are all dealt with here (p6–7).
Chapter V requires a completion report within one month, placed in the public domain, plus KPI-based monitoring, measurement and verification (p7). Chapter VI gives the Commission powers to amend, relax, remove difficulties and issue directions, with disputes decided under the Conduct of Business Regulations, 2004 (p8). Schedule-X lists the indicative components of smart grid projects (p9).
Read with this
No other documents to read with it are on Voltaic.
Voltaic last read HERC's website for final documents on 24 Nov 2026 (2 pages). A document HERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of HERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.