Haryana Electricity Regulatory Commission (Smart Grid), Regulations, 2016

RegulationDated 25 May 2016Regulation No. HERC/ 33 /2016 dated The 25th May, 2016

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on herc.org.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Haryana Electricity Regulatory Commission issued these regulations on 25 May 2016 under s.181(2)(zp) of the Electricity Act, 2003, to create a framework for smart grid planning, approval, execution and evaluation across the State grid (p1, p3). They come into force from the date of publication in the Haryana Government Gazette; no Gazette date is printed (p1).

Chapter I sets the title, commencement and extent, binding generating companies, transmission and distribution licensees and consumers connected to the Haryana State grid, and defines the vocabulary the rest of the regulation uses — AMI/smart meters, aggregators, cyber security, electric energy storage, interoperability, KPIs, microgrids, smart grid and WAMS (p1–2).

Chapter II states the objectives (economy, efficiency, network security, renewable and microgrid integration) and lets the Commission issue guidelines on programme formulation, implementation, cost-effectiveness assessment, monitoring, customer engagement, data protection, training and funding methodology, without making such guidelines a precondition for filing a plan (p3).

Chapter III requires every transmission and distribution licensee to constitute a Smart Grid Cell within three months of notification, with baseline study, plan formulation, approval-seeking, implementation and measurement duties, which may be merged with energy efficiency and demand side management work (p4).

Chapter IV is the operative process: baseline study and database building, a Multi-Year Smart Grid Plan filed with the MYT/ARR petition, prior Commission approval for projects above the stated investment threshold, prescribed contents of the project proposal, indicative tariff design options such as critical peak pricing and real-time pricing, and a cross-reference to Schedule-X (p4–6). Approval conditions, incentives/disincentives, cost-recovery methodology, execution standards (CEA, then Commission, then BIS, then IEC/IEEE/ANSI) and consumer data protection are all dealt with here (p6–7).

Chapter V requires a completion report within one month, placed in the public domain, plus KPI-based monitoring, measurement and verification (p7). Chapter VI gives the Commission powers to amend, relax, remove difficulties and issue directions, with disputes decided under the Conduct of Business Regulations, 2004 (p8). Schedule-X lists the indicative components of smart grid projects (p9).

Standard name
Smart Grid Regulations
Primary topics
Smart grid, Capital cost and investment, Technical standards

Read with this

No other documents to read with it are on Voltaic.

Voltaic last read HERC's website for final documents on 24 Nov 2026 (2 pages). A document HERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of HERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on herc.org.in ↗

Report an issue with this document