EV Charging Infrastructure, Tariff and Other Regulatory Issues Regulations, 2021 — 1st Amendment, 2024

Haryana Electricity Regulatory Commission Terms and Conditions for setting up Charging Infrastructure, Tariff and other Regulatory issues for Electric Vehicles), Regulations, 2021, (1st Amendment) Regulations, 2024

AmendmentDated 19 Jul 2024Regulation No. HERC/55/2021/1st Amendment/2024 dated The 19th July, 2024

Amends the Charging Infrastructure, Tariff and Other Regulatory Issues for Electric Vehicles Regulations, 2021.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on herc.org.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the first amendment (2024) to HERC's 2021 regulation on charging infrastructure and tariffs for electric vehicles. It was notified on 19 July 2024 under section 181 of the Electricity Act 2003 and applies across Haryana, coming into force on Gazette publication (p1).

Section 1 gives the short title, the Gazette-linked commencement and the territorial extent to the whole State of Haryana (p1). Sections 2 and 3 substitute Regulation 17(f) and Regulation 18(e) of the 2021 parent regulation with identical text: for HT connections to E-Vehicle charging stations with load up to 200 kW, the cost of the separate/dedicated transformer and allied equipment is to be borne out of the Discoms' CSR fund, and where that fund falls short the distribution licensee recovers the amount through its ARR/true-up petition (p1–2). Section 4 inserts a new clause 17(2) allowing HT metering to be provided by an outdoor CT/PT unit on an H-pole with the transformer placed at the nearest point outside an explosive zone — for fire-prone premises such as petrol pumps and gas agencies — with LT supply taken inside the charging station (p2).

The order is signed by the Deputy Secretary (Personnel) for the Secretary, HERC, dated 19 June 2024, a month before the notification date (p2).

Standard name
Electric Vehicle Charging
Primary topics
Connection and miscellaneous charges, Metering

Read with this

Voltaic last read HERC's website for final documents on 24 Nov 2026 (2 pages). A document HERC issued after the page that lists it was read may not be held by Voltaic yet.