Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Uttar Pradesh Electricity Regulatory Commission's notification of 17 November 2022 making the UPERC (Facilitation of Telecommunication Network) Regulations, 2022, issued under s.51 read with s.181(o) and (y) of the Electricity Act, 2003 (p5). It creates a framework for distribution licensees and franchisees in Uttar Pradesh to let telecom companies place their networks on discom assets — poles, distribution transformers, official buildings, but expressly not wires and the poles/towers on 33 kV lines (p5–6).
Clause 1 fixes the title, statewide extent, application to distribution licensees/franchisees and commencement on Gazette publication. Clause 2 sets the definitions — distribution assets, gross revenue, telecom company, metering mechanism, the rental agreement — and interpretation rules, including that English prevails over Hindi. Clause 3 requires the licensee to report to the Commission each year through its ARR on the nature and extent of telecom use of its assets, the impact on its licensed business and the rental revenue earned, with an auditor's certificate at true-up; it also obliges the telecom company to get cable colour code, size and weight per metre, clearing distances, and pole/tower safety clearances approved by the licensee (p6–7).
Clause 4 governs the commercial arrangement: renting of distribution assets and related services, a rental and related services agreement with periodic revision of rentals, a ceiling on how much of a licensee's total assets one telecom company may access, allocation through a transparent process, treatment of rental income as non-tariff income under the MYT framework with a split between licensee retention and non-tariff income, auditor certification, and safeguards that renting must not reduce capacity for consumers, compromise asset safety or degrade service standards (p7). Clause 5 requires separate electricity connections at each point of installation, smart metering and point-of-installation billing, permits consolidated division-level billing for one telecom company, places connection and meter costs on the telecom company, and counts consumption revenue as tariff income (p7–8). Clauses 6 to 8 give the Commission inherent powers, power to remove difficulties and power to amend, and a savings clause that overrides the MYT Tariff Regulations 2019 for rental non-tariff income (p8).
Read with this
No other documents to read with it are on Voltaic.
Voltaic last read UPERC's website for final documents on 24 Nov 2026 (2 pages). A document UPERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of UPERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.