SSERC · Sikkim State Electricity Regulatory Commission
SLDC Fee and Charges Regulations, 2017
Sikkim State Electricity Regulatory Commission (Levy and Collection of Fee and Charges by State Load Despatch Centre) Regulations, 2017.
RegulationDated 6 Nov 2017No: 16/SSERC/SLDC-Fee/2017 dated 06.11. 2017
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Sikkim State Electricity Regulatory Commission made these regulations under s.181(2) read with s.32(3) of the Electricity Act 2003 to fund the State Load Despatch Centre, notified as No. 16/SSERC/SLDC-Fee/2017 dated 06.11.2017 (p1).
Regulation 1 brings them into force on Gazette publication and confines their reach to intra-State transmission licensees and generating stations monitored and despatched by the SLDC, excluding generating stations of installed capacity below 1 MW (p1). Regulation 2 defines the working terms — billing month, financial year, intra-State transmission system, SLDC and State Government — and, notably, treats the transmission wing of the Energy & Power Department as the State Transmission Utility until a separate utility is notified; where the regulations and the Act diverge, the Act prevails (p1–2).
Regulation 3 requires SLDC expenses to be accounted separately and recovered from generators and transmission licensees, requires each user to register with the SLDC on a prescribed application with a registration fee, lists the cost heads that feed SLDC charges, and makes the charges payable monthly by network users in proportion to contracted capacity, with the charge to be determined by the Commission by formula (p2–3). Regulation 4 sets the annual revenue requirement cycle: filing four months before the financial year in the Annexure 1–14 formats, prior Commission approval for capital projects above a stated cost, scrutiny and information calls, a variation trigger for revising charges, annual filing even without revision, and carry-forward of recovery shortfalls or excess (p3). Regulation 5 covers monthly billing, payment timelines, penal interest, first-charge priority over other payments, and a dispute route that ends with the Commission (p4). Regulation 6 preserves the Commission's general and residuary powers (p4). Annexures 1–14 (p5–18, incomplete) are the prescribed filing and registration formats.
Read with this
No other documents to read with it are on Voltaic.
Voltaic last read SSERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 21 Nov 2026. A document SSERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of SSERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.