The Haryana Electricity Regulatory Commission made the Haryana Grid Code (HGC) Regulations, 2009 by notification dated 12 May 2009, Regulation No. HERC/22/2009, under s.181(2)(zp) read with s.86(1)(h) of the Electricity Act 2003 (p1). It is the State's single rulebook for the boundary between the transmission licensee and everyone else using the State transmission system: how HVPNL as STU and transmission licensee, the SLDC, generating companies, other transmission licensees, trading and distribution licensees, suppliers, bulk power consumers and open-access customers connect to and operate that system. It extends to the whole State and takes effect on Gazette publication; the Gazette date is not printed (p1).
The definitions article runs from p2 to p10 and is only partly captured here. Chapter 1 (pp11–13) sets the general frame — objective, scope, implementation duties, confidentiality of user information, written communication, partial invalidity, State Government directives, the compliance and non-compliance chain (escalation through the Grid Co-ordination Committee to the Commission, with ss.142/146 and possible disconnection in view), and an exemption route requiring an advance petition to the Commission. A closing note records that STU and SLDC roles will be separated once SLDC becomes a separate company under s.31(2).
Chapter 2 (pp14–17) recites and elaborates the statutory roles of CEA, SLDC (scheduling and despatch, system operation and restoration, metering and data, UI and reactive energy accounts, grievance handling for intra-State open access, certification for charges), STU (planning, non-discriminatory open access, nodal agency for access), transmission licensees and distribution licensees, including the ALDC/DSOCC control structure for distribution.
Chapter 3 (pp18–22) is the Planning Code: triggers for reinforcement, planning policy and study techniques, the annually updated five-year perspective transmission plan (published by 30 September) with its investment plan, planning criteria for withstanding defined contingencies, standard and detailed planning data, and implementation of the plan.
Chapter 4 (pp23–31) is the Connection Conditions: application and offer procedure, grounds for rejection, connection agreements, site access, frequency and voltage variation requirements, equipment and protection requirements, fault clearance, generating-unit capabilities (AVR, governor droop, frequency response), reactive power compensation, data communication and recording instruments, connection and safety standards, Site Responsibility Schedules, single-line diagrams and site common drawings, the annual asset schedule, and connection points for generators, distribution companies, the regional system and CGPs/bulk consumers.
Chapter 5 (p32, cut off) opens the Operating Code: operating policy (SLDC-developed internal procedures for restoration, load shedding and islanding, submitted to the Commission within three months; round-the-clock manning of control rooms) and system security (operate as one synchronized system, no deliberate islanding or removal of important grid elements except in defined situations or on SLDC instruction).
Read with this
No other documents to read with it are on Voltaic.
Voltaic last read HERC's website for final documents on 24 Nov 2026 (2 pages). A document HERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of HERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.