MPERC · Madhya Pradesh Electricity Regulatory Commission
Madhya Pradesh Electricity Distribution Code (Revision-1), 2024
Madhya Pradesh Electricity Distribution Code (Revision-1), 2024 {RG-29 (I) of 2024}
CodeDated 3 Oct 2024No. /MPERC/2024/2198. dated 3rd October 2024
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Madhya Pradesh Electricity Regulatory Commission issues the Madhya Pradesh Electricity Distribution Code (Revision-I), 2024, a state distribution code that replaces the 2006 Distribution Code (p1, p22). It extends to Madhya Pradesh and comes into force on the date of its publication in the State official gazette; the gazette date is not printed in this text (p1). The Code sets the technical, planning and operational framework for distribution licensees and all users of their distribution systems.
Chapter 1 (p1–2) states the objectives, scope, commencement, compatibility with CERC/MP Grid Code/MP Supply Code/CEA/BEE instruments, confidentiality and communication arrangements, and the Code’s eight-chapter structure. Chapter 2 (p3) defines terms mostly by cross-reference to the Electricity Act 2003, MP Supply Code 2021 and CEA metering regulations, and defines “User” broadly to include licensees, embedded generators, consumers/prosumers and open access consumers.
Chapter 3 (p4–12) is the planning chapter. It requires safety/technical audits, public safety-violation reporting, SOPs and loss-reduction planning; it cross-refers planning to CEA technical/safety/connectivity/metering regulations and BEE energy-audit and capital-expenditure guidelines; and it specifies planning criteria covering substation siting and capacity, N-1 redundancy, asset geo-tagging and digital modelling, reactive power and harmonics management, transformer loading and standardisation, conductor and cabling choices, HT/LT ratio, dedicated feeders, SCADA/DMS/AMI, smart metering, testing infrastructure, energy audits and environmental clearance. It also directs a transition away from diesel backup in larger cities and integration of DERs and EVs.
Chapter 4 (p13–17) covers operations and maintenance: Distribution Control Centre functions and SLDC coordination; a supply-position portal and restrictions on discretionary load shedding; outage planning and a shutdown portal; contingency and demand management/load shedding; maintenance SOPs, responsibility matrix and a survey-plan-execute-cross-verify cycle; and interfaces with generating units including CPPs and distributed generation resources.
Chapter 5 (p18) sets cross-boundary safety requirements, Electrical Safety Officer designations and written procedures. Chapter 6 (p19–20) covers incident definitions, real-time oral intimation and written-report timelines, the incident proforma, licensee-to-user reporting and optional joint investigation. Chapter 7 (p21) requires protection schemes, coordination with STU/EHV protection, engagement with the Protection Co-ordination Committee, short-circuit studies and a Protection Manual. Chapter 8 (p22) covers meters, connection conditions, the Commission’s powers to remove difficulties, relax and amend, and repeal of the 2006 Code.
Read with this
No other documents to read with it are on Voltaic.
One more document belongs here and is not on Voltaic: a copy in another language.
Voltaic last read MPERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (4 pages). A document MPERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of MPERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.