Skip to content

MERC · Maharashtra Electricity Regulatory Commission

Terms and Conditions of Appointment of Consultants Regulations, 2004

Maharashtra Electricity Regulatory Commission (Terms and Conditions of Appointment of Consultants) Regulations, 2004

RegulationDated 10 Jun 2004No MERC/Legal/111/2004/1085 dated 10th June, 2004

1 amendment to it is on Voltaic, dated 24 May 2018.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on merc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

These are MERC's own housekeeping rules for hiring outside consultants to assist the Commission on matters arising under the Electricity Act, 2003. They are made under s.91(4) of the Act and replace the Commission's 2000 consultants regulations (p1). They apply only to consultants appointed under Regulation 3, and take effect from Gazette publication — the Gazette date is not printed, though the notification is signed in Mumbai on 10 June 2004 (p1, p9).

Regulations 1–2 give the short title, commencement, application and definitions (Act, Bidder, Commission, Consultant, Officer, Secretary) (p1–2). Regulation 3 leaves selection entirely to the Commission's discretion, whether by evaluating competitive proposals under Annexure A or by single-source selection, with the budget approved by the Commission (p2). Regulation 4 requires the contract terms to be settled before work starts and lists what they must cover — scope, fees, deliverables and the standard terms in Annexure B — with provisos on how scope changes before and after signing affect fees (p2–3). Regulation 5 imposes conflict-of-interest, confidentiality and record-handover duties, and makes the Commission the final interpreter (p3). Regulations 6–9 provide for website disclosure of awarded work, the Commission's inherent power to depart from its own procedure, a general power to amend the regulations, and a power to remove difficulties (p4).

Annexure A sets out what the Request for Proposal must contain, the conditions a bidder must satisfy, and the quality-and-cost basis for evaluation (p5–6). Annexure B is a standard contract template covering confidentiality and its exceptions, 90-day payment endeavour, duty of care, IP ownership, consultant liability with a 30-day slippage termination right, a Force Majeure definition and illustrative events, termination grounds and notice, and Indian governing law (p7–9). The document is self-contained and procedural rather than tariff- or grid-facing.

Standard name
Appointment of Consultants
Primary topics
Force majeure and change in law

Read with this

Commencement notices and reasons

4 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft not held as English text, 1 amendment not held as English text and 1 copy in another language.

Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of MERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on merc.gov.in ↗

Report an issue with this document