Tariff for Sale of Power by Captive Power Plants to Distribution Licensees Regulations, 2010
The Rajasthan Electricity Regulatory Commission (Tariff for sale of power by Captive Power Plants to distribution licensees) Regulations, 2010
RegulationDated 24 May 2010No.RERC/Secy/Reg 81 dated 24.5.2010
1 amendment to it is on Voltaic, dated 30 Sep 2011.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a tariff regulation issued by the Rajasthan Electricity Regulatory Commission under s.61 read with s.181 of the Electricity Act 2003, notified as No.RERC/Secy/Reg 81 at Jaipur on 24 May 2010 (p1). Its subject is the price at which captive power plants may sell electricity to distribution licensees in Rajasthan. It applies to CPPs but not to plants based on renewable energy sources, and it does not apply where a licensee procures through a power exchange or competitive bidding (p1). It takes effect from gazette publication, and no gazette date is printed here (p1).
Regulation 2 defines the working vocabulary — CPP, inadvertent power supply, existing CPPs, long-term and short-term supply, peak/off-peak/normal hours, despatch schedule, standby and start-up supply — and falls back on Ministry of Power Rules, the RERC Tariff Regulations 2009 and the Act for anything undefined (pp1–2). Regulation 3 lets a CPP sell to the in-state distribution licensee under various commercial arrangements, or to third parties including through a power exchange via open access (p2).
Regulation 4 is the core. For long-term supply (a year or more), a CPP of 50 MW and above may choose between case-by-case tariff determination as a generating company and a normative fixed-plus-variable charge (p2). It designs a time-of-day package — off-peak, normal, peak and round-the-clock — with a peak incentive (p2), sets the formula and fuel-price basis for the variable charge with quarterly fuel adjustment (pp2–4), and prescribes normative performance parameters for coal/lignite rankine-cycle plants, leaving other technologies to case-by-case determination (p3). Fixed charges are built on the RERC Tariff Regulations 2009 with specified changes to the return on equity, O&M and capital-cost treatment (pp3–4), and the norms are to be reviewed at the end of the existing tariff control period (p4).
Regulation 5 prices short-term supply (under a year) against the HT industrial tariff with seasonal and peak/non-peak differentiation (p4); Regulation 6 treats inadvertent injection as deemed sale — unpaid and unbanked beyond tolerance, otherwise settled at the UI rate (p4). Regulation 7 covers grid connectivity charges, reactive energy exchange (expressly an interim arrangement pending RVPN studies), SLDC fees, and optional standby/start-up supply (p5). The unnumbered paragraph between Regulations 7 and 9 disapplies intra-state ABT to CPPs, except when capacity is sold outside Rajasthan (pp5–6).
Regulations 9 to 11 deal with scheduling for CPPs of 25 MW and above, metering and energy accounting, and the commercial machinery — PPAs, contract-demand reduction, billing cycles and payment adjustment (pp6–7). Regulations 12 to 15 reserve the Commission's powers to deviate from norms, to amend the regulations and to remove difficulties, and repeal the 2007 CPP tariff regulations with a savings clause (p7).
Read with this
Amendments and corrections
Voltaic last read RERC's website for final documents on 24 Nov 2026. A document RERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of RERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.