HERC · Haryana Electricity Regulatory Commission
Conditions of Licence for Distribution and Retail Supply Business Regulations, 2004
Haryana Electricity Regulatory Commission (Conditions of Licence for Distribution and Retail Supply Business) Regulations, 2004
RegulationDated 30 Nov 2004HERC/ 07/2004 dated The 30th November, 2004
1 amendment to it is on Voltaic, dated 16 Dec 2008.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a HERC notification dated 30 November 2004, issued as Regulation No. HERC/07/2004, which frames the standard conditions attached to a distribution and retail supply licence in Haryana (p1). It is made under Section 16 read with Section 181 of the Electricity Act 2003, extends to the State of Haryana, and applies to licences issued under Section 14 for distribution and retail supply of electricity (p1). The Regulations themselves are only four clauses: short title and commencement on Gazette publication, definitions taken by reference to the 2003 Act and the Haryana Electricity Reform Act 1997, the operative provision that the licence conditions are those set out in Form-I, and a power for the Commission to remove difficulties by order (p1).
The bulk of the document is Form-I, a model "Distribution & Retail Supply Licence" (pp2–20). Part I carries the licence's own definitions and the grant itself — a licence over the area of supply in Schedule 1 with a 25-year term, subject to the conditions in Parts II–V (pp2–5). Part II holds the general conditions: compliance with Commission regulations and codes; prior consent for power procurement, sale of electricity, takeovers and mergers; notice of changes in controlling interest; duties including open access and duty to supply; restrictions on subsidies; separate-business accounting with audit and filing deadlines; controls on asset disposal; investment-plan approval; licence fees; dispute resolution; penalties; and the terms of revocation (pp5–13). Part III sets technical conditions — load forecasting, approved and transparent power procurement, compliance with the State Grid Code, the Distribution Code and Standards of Performance, cooperation with STU/SLDC, and consumer service obligations such as the Supply Code, Customer Charter, complaint procedure and grievance forum (pp14–18). Part IV deals with tariff setting and the annual expected revenue requirement calculation (pp18–19), and Part V covers the licensee's powers and the introduction of competition in the same area of supply (pp19–20).
The operative detail is heavily cross-referenced: the licence repeatedly defers to separate HERC instruments of 2004 — the Fee Regulations, Conduct of Business Regulations, Standards of Performance Regulations, the Electricity Supply Code and the Consumer Forum/Ombudsman Regulations (pp13, 16–17).
Read with this
Amendments and corrections
Voltaic last read HERC's website for final documents on 24 Nov 2026 (2 pages). A document HERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of HERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.