Communication System for Inter-State Transmission of Electricity Regulations, 2017

Central Electricity Regulatory Commission (Communication System for inter-State transmission of electricity) Regulations, 2017

RegulationDated 15 May 2017In force from 1 Jul 2017F. No. L-1/210/2016/CERC dated 15th May, 2017

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

These are CERC's principal regulations on the communication system needed for inter-State transmission and National Grid operation, notified on 15 May 2017 and effective 1 July 2017 (p7–8). The preamble explains the Commission's function under s.79(1)(c) and (h) of the Electricity Act and the need for rules, guidelines and standards for continuous data availability, planning, implementation, O&M and upgrading of reliable communication for integrated operation (p7–8).

Chapter 1 names the regulations and commencement; Chapter 2 defines the technical and institutional vocabulary—communication system, associated communication system, channel, control centre, data, FSP, PMU, RTU, REMC, SCADA, system operation function, User and wide band Node—and picks up definitions from the Act, Grid Code and other CERC regulations (p8–9).

Section 4 states the objective; Section 5 applies the regulations to communication infrastructure for data and tele-protection at National, Regional and inter-State level and to State level until SERCs frame their own regulation, binding Users, SLDCs, RLDCs, NLDC, CEA, CTU, STUs, RPCs, REMC, FSP and power exchanges (p9). Section 6 designates CTU and STU as nodal agencies for inter-State and intra-State planning, with RLDC/SLDC integration roles (p10).

Section 7 allocates roles: CEA planning criteria, technical standards, cyber security and standing committee; CTU national backbone planning and centralized supervision procedure; NPC guidelines on availability; RPC certification, outage planning and compliance monitoring; NLDC interfacing guidelines and integration; RLDCs and SLDCs integration, supervision and data; STU state backbone; Users compatible equipment, integration, expansion/O&M (p10–12). Section 8 sets the communication system boundary lists for ISTS and intra-State systems (p12).

Sections 9–11 cover periodic testing, annual performance audit and fault reporting/route diversion (p12–13). Section 12 sets the availability requirement, Section 13 cyber security and CERT-In certified third-party audits (p13). Section 14 directs NLDC, CTU and NPC to prepare specified guidelines/procedures with public consultation and Commission approval; Sections 15–17 cover dispute resolution, power to relax and power to remove difficulty (p13–14).

Primary topics
Communication and SCADA, Transmission availability and outages, Cyber security

Read with this

No other documents to read with it are on Voltaic.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of CERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document