Terms and Conditions for Determination of Tariff for Renewable Energy Sources Regulations, 2025
Chhattisgarh State Electricity Regulatory Commission (Terms and conditions for determination of tariff for Renewable Energy sources) Regulations, 2025
RegulationDated 17 Dec 2025In force from 1 Apr 2025
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Chhattisgarh State Electricity Regulatory Commission (CSERC) makes these Regulations under s.61 and s.86 read with s.181 of the Electricity Act 2003 to fix the terms and conditions for determining tariff for renewable energy (RE) generating stations in the State that sell power to distribution licensees (p3). They come into force from 1 April 2025 and run for five years, and the Control Period is five years from the same date (p3, p10).
Regulations 1–4 set scope and eligibility: they apply to RE projects achieving COD between 1 April 2025 and 31 March 2030 that supply their entire output to State distribution licensees on a long-term basis, and they list eligibility criteria — new plant and machinery — for wind, hydro, non-fossil co-generation, solar PV/floating solar/solar thermal/rooftop, MSW and RDF, biogas, biomass gasifier, renewable hybrid and renewable-with-storage projects (p8–9). Existing projects with 20-year-plus PPAs and COD before 31 March 2025 stay under their earlier tariff orders, except that energy charges for fuel-based projects follow these Regulations (p8).
Chapter 1 (Reg. 5–12) covers general principles: control period, tariff period equal to useful life, which technologies get generic versus project-specific tariff, petition procedure and filing requirements, single-part tariff structure (two-part for fuel-based technologies), levelisation, and dispatch — all RE plants are treated as must-run, with limited exemptions from scheduling and deviation settlement (p10–15).
Chapter 2 (Reg. 13–24) sets financial principles: composition of capital cost, debt-equity, interest on loan, depreciation, return on equity, interest on working capital, O&M escalation, rebate, late payment surcharge, the ceiling-norm character of all norms, treatment of subsidy, and pass-through of statutory charges (p16–20).
Chapters 3–12 (Reg. 25–78) give technology-specific parameters for wind, small hydro, non-fossil co-generation, solar PV, solar thermal and floating solar, MSW and RDF, biogas, biomass gasifier, renewable hybrid and renewable-with-storage projects — each specifying how capital cost, CUF/PLF, auxiliary consumption, O&M and, where relevant, heat rate, calorific value and fuel cost are handled (p21–32).
Chapter 13 (Reg. 79–81) provides for deviation from norms and the Commission's powers to relax provisions and remove difficulties (p33). The annexed Forms 1.1–3.2 are petition templates for parameter assumptions, tariff-component computation and fuel-use reporting (p34–40).
Read with this
No other documents to read with it are on Voltaic.
One more document belongs here and is not on Voltaic: a copy in another language.
Voltaic last read CSERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document CSERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of CSERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.