Skip to content

APERC · Andhra Pradesh Electricity Regulatory Commission

Security Deposit Regulation, 2004 — Third Amendment, 2025 — Statement of Reasons

Third Amendment to the Andhra Pradesh Electricity Regulatory Commission (Security Deposit) Regulation, 2004 (Regulation No. 6 of 2004)

Statement of reasonsDated 24 Feb 2025Regulation No.3 of 2025 dated 24-02-2025

The commission's reasons for the Security Deposit Regulation, 2004 or one of its amendments.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on aperc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

APERC's 24 February 2025 order disposes of stakeholder objections to the draft Third Amendment to the APERC (Security Deposit) Regulation, 2004, and Annexure-II carries the amendment itself as Regulation No. 3 of 2025 (p1, p6). The trigger is central metering policy: the CEA's 2019 and 2022 amendments to the Metering Regulations, 2006 require smart meters with prepayment features, and Ministry of Power notifications of 17.08.2021 set replacement timelines (p1–2). The three AP DISCOMs asked the Commission to align its regulations and the General Terms and Conditions of Supply with smart metering, so a common public notice was published on 01.01.2025 with comments due 22.01.2025, later extended to 29.01.2025; 32 responses were received (p2).

Pages 3–4 are the substance: the proposed substitution of clause 4(3)(iii) of the Security Deposit Regulation, the objections received, and the Commission's decision. One objector argued the deposit waiver must rest on the consumer's option under s.47(5) of the Electricity Act and wanted a prepaid/normal meter choice in the application form, while APEPDCL and APCPDCL argued that the choice of prepayment meters should lie with the distribution licensee. The Commission sided with the consumer-option view, modified the draft 'for greater clarity', and rejected the DISCOM suggestion as contrary to s.55 of the Act and clause 6(2)(b) of the CEA Metering Regulations (p4). Annexure-I lists the objectors (p5).

Annexure-II is the operative regulation: short title, extent to the whole of Andhra Pradesh, commencement on Gazette publication, and the substituted text of clause 4(3)(iii) allowing a licensee to collect no security deposit from an applicant prepared to take supply through a prepayment meter, with existing consumers' deposits adjusted against dues and any balance credited to the e-wallet linked to the prepayment meter (p6).

Standard name
Security Deposit
Primary topics
Security deposit, Metering

Read with this

The regulation

Amendments and corrections

Consolidated copies, for reference (1)

Proposed changes (drafts with no final yet)

Voltaic last read APERC's website for final documents on 24 Nov 2026 (2 pages) and for drafts on 21 Nov 2026. A document APERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on aperc.gov.in ↗

Report an issue with this document