Meghalaya Terms and Conditions of Open Access Regulations, 2026 — Draft

Meghalaya State Electricity Regulatory Commission (Terms and Conditions of Open Access) Regulations, 2026

Draft regulationDated 5 Oct 2026No. MSERC/Open Access-REG/2026/ : dated 5th October 2026

Draft

A proposal, not law. Voltaic holds no final regulation made from this draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on mserc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the pre-publication draft of the Meghalaya State Electricity Regulatory Commission (Terms and Conditions of Open Access) Regulations, 2026, issued by MSERC on 5 October 2026 (pp1–2). It will come into force on the date of notification in the Meghalaya Gazette, replacing the 2012 open access regulations; no Gazette date is printed (p2, p55). It applies to open access on the intra-State transmission and distribution systems in Meghalaya, including where those systems are used with the inter-State transmission system (p2).

Chapter 1 (pp2–8) sets the short title, scope, commencement and the defined terms used throughout — open access, long-term, medium-term and short-term access, transmission and wheeling charges, cross-subsidy and additional surcharge, nodal agency, imbalance, reactive energy, force majeure and others. Chapter 2 (pp9–14) covers connectivity: consumers or generating stations of 5 MW and above apply to the STU for intra-State transmission connectivity, while those below 5 MW apply to the distribution licensee; it sets application content, fees, processing timelines, interconnection studies, connection agreements, and testing/infirm power treatment.

Chapter 3 (pp15–20) is the general open-access framework. It lists who is eligible — distribution licensees, generating companies, trading licensees, captive generating plants and consumers — makes open access permissible for consumers seeking capacity of 1 MW and above, with captive and Commission-discretion exceptions, addresses independent feeders and rostering, bars insolvent or dues-defaulting applicants, and requires metering/RTU infrastructure. It also classifies open access by system, location and duration, sets criteria for long-term, medium-term and short-term access — including deeming successive short-term access as medium- or long-term — and lays down allotment priority.

Chapter 4 (pp21–35) is the application and approval procedure. It establishes the nodal agency, the application form, the requirement that applicants not have PPAs with more than one person for the same power, and refers fee, document and timeline details to Annexure Tables 1 and 2. It gives separate routes for long-term access, medium-term open access and short-term open access (advance, day-ahead, contingency and bidding), with inter-State cases routed through the CERC framework. It also covers consent by STU/SLDC/distribution licensee, rejection of defaulter applications, applications by other entities, and a detailed procedure to be submitted within 30 days of notification (p34).

Chapter 5 (pp36–40) specifies the charges: transmission charges, scheduling and system operation charges, wheeling charges, cross-subsidy surcharge, additional surcharge and standby charges. Chapter 6 (pp41–43) covers scheduling thresholds, special energy meters, revisions, transmission and distribution losses, and energy accounting. Chapter 7 (pp44–45) covers imbalance/deviation settlement and reactive energy charges, including payment timelines and interest. Chapter 8 (pp46–48) covers billing, collection and disbursement, late payment surcharge, default consequences, payment security through a letter of credit, and dispute resolution. Chapter 9 (pp49–51) requires SLDC to publish open-access information and reports, and provides a separate route for generating stations connected to a distribution system. Chapter 10 (pp52–56) deals with under-utilisation and relinquishment compensation, capacity availability computation, curtailment priority, removal of difficulties, orders and directions, repeal and savings, and power to amend. The Annexure (pp57–81) contains Tables 1 and 2, which set out application fees, accompanying documents, disposal timelines, and applicable charges and losses by category for distribution-system and transmission-system applicants.

Standard name
Open Access Regulations
Primary topics
Open access, Open access charges, Connectivity and GNA

Read with this

The regulation itself is not yet published on Voltaic.

Proposed changes (drafts with no final yet)

One more document belongs here and is not on Voltaic: a main regulation.

Voltaic last read MSERC's website for final documents on 26 Nov 2026 and for drafts on 21 Nov 2026. A document MSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on mserc.gov.in ↗