MPERC · Madhya Pradesh Electricity Regulatory Commission
Madhya Pradesh (Demand Side Management) Regulations, 2016
Madhya Pradesh Electricity Regulatory Commission (Demand Side Management) Regulations, 2016
RegulationDated 5 Oct 2016No. 1616 /MPERC /2016 dated 05.10.2016
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Commission's principal framework regulation for demand side management in Madhya Pradesh, issued at Bhopal on 05.10.2016 under s.181(2)(zp) of the Electricity Act, 2003, and expressed to extend to the whole State alongside the distribution licensees' supply jurisdiction (p1). It comes into force from the Gazette publication date, which is not printed in this text (p1).
Regulations 1–2 set the title, extent, commencement and definitions, including the working vocabulary of the regime: baseline data, the Cost Effectiveness Index, DSM as licensee action beyond the customer's meter, DSM Resource Acquisition, Energy Service Company and Evaluation, Measurement and Verification (p1–2).
Regulations 3–6 establish the governance layer: the Commission, in consultation with distribution licensees and the State nodal agency designated by the Bureau of Energy Efficiency, formulates DSM objectives (p2–3), oversees a statewide technical-potential assessment due within six months of notification (p3), sets DSM targets per licensee (p3), and issues process guidelines covering load research, programme implementation, cost-effectiveness assessment, monitoring, eligibility, target-setting and database development (p3–4).
Regulations 7–13 are the licensee-facing machinery: a DSM Cell with defined responsibilities (p4), load and market research leading to baseline data (p4–5), a perspective DSM plan due within one year of notification and rolled forward annually (p5–6), Commission review and approval of the plan (p6), a Programme Document per programme (p6), prior Commission approval before any programme is implemented with a prescribed content list (p6–7), and implementation duties including quick-gain programmes (p7).
Regulations 14–17 cover money and verification: identification of net incremental costs and proposed recovery methodology, with cost recovery conditional on prior approval, adherence to the approved plan and cost effectiveness (p8); monitoring and reporting (p8); evaluation, measurement and verification, including third-party verification with a conflict-of-interest proviso (p8–9); and six-monthly progress reports plus a programme completion report within one month of completion (p9). Regulation 18, headed 'Savings', in fact carries amendment power, a power to remove difficulties, power to issue orders and practice directions, and dispute resolution by the Commission (p9).
Read with this
No other documents to read with it are on Voltaic.
One more document belongs here and is not on Voltaic: a copy in another language.
Voltaic last read MPERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (4 pages). A document MPERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of MPERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.