The Chhattisgarh State Electricity Grid Code, 2011 is CSERC's principal grid code for the State, notified as No. 40/CSERC/2011 and dated 31/12/2011 (p1). It presents itself as the code made after CERC notified the IEGC Regulations 2010, and is to be read with the State Supply Code, the CSERC Connectivity and Intra-State Open Access Regulations 2011, and listed CEA regulations (pp1, 7–8).
The pages cover Chapters 1–4 and the contents list for all 13 chapters (pp8–9). Chapter 1 (pp1–9) contains the introduction, short title/extent/commencement, a long list of definitions, application of other codes, and the arrangement of the Code. Chapter 2 (pp10–12) states the scope — every transmission licensee including the STU, the SLDC and every intra-State user connected to or using the intra-State transmission system — and requires connection agreements, protection, telemetry, recording instruments, single-line diagrams, site common drawings and metering. It also creates the State Grid Coordination Committee, with membership, functions, six-monthly meetings and a role in recommending amendments.
Chapter 3 (pp13–25) is the Planning Code. It sets STU planning and coordination duties, a ten-year plan with a five-year control-period business plan, load-forecasting duties on distribution licensees, planning studies and data assessment, generation availability assessment, adoption of CEA planning criteria, steady-state and transient security standards, substation/switchgear criteria, transmission line routing and design criteria, reactive compensation, and data exchange through Annexures A and B.
Chapter 4 covers connectivity conditions. It fixes connection/interface points, maximum injection quantum by voltage, separate connectivity modes for generators/CGPs above 15 MVA and up to 15 MVA, treatment of existing non-compliant connections, distribution licensee and inter-utility connections, application procedure under the Open Access Regulations, general conditions of connectivity, telemetry from 1 MW, safety isolating devices, and equipment design criteria for generating units and excitation systems.
Read with this
No other documents to read with it are on Voltaic.
2 more documents belong here and are not on Voltaic: 1 copy in another language and 1 corrigendum not held as English text.
Voltaic last read CSERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document CSERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of CSERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.