Skip to content

CSERC · Chhattisgarh State Electricity Regulatory Commission

Chhattisgarh State Electricity Grid Code, 2011

CodeDated 31 Dec 2011No. 40/CSERC/2011 dated 31/12/2011

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cserc.gov.in ↗

Summary

Summary written by software, from pages 1 to 35 of 124. Check the regulator's original before you rely on it.

The Chhattisgarh State Electricity Grid Code, 2011 is CSERC's principal grid code for the State, notified as No. 40/CSERC/2011 and dated 31/12/2011 (p1). It presents itself as the code made after CERC notified the IEGC Regulations 2010, and is to be read with the State Supply Code, the CSERC Connectivity and Intra-State Open Access Regulations 2011, and listed CEA regulations (pp1, 7–8).

The pages cover Chapters 1–4 and the contents list for all 13 chapters (pp8–9). Chapter 1 (pp1–9) contains the introduction, short title/extent/commencement, a long list of definitions, application of other codes, and the arrangement of the Code. Chapter 2 (pp10–12) states the scope — every transmission licensee including the STU, the SLDC and every intra-State user connected to or using the intra-State transmission system — and requires connection agreements, protection, telemetry, recording instruments, single-line diagrams, site common drawings and metering. It also creates the State Grid Coordination Committee, with membership, functions, six-monthly meetings and a role in recommending amendments.

Chapter 3 (pp13–25) is the Planning Code. It sets STU planning and coordination duties, a ten-year plan with a five-year control-period business plan, load-forecasting duties on distribution licensees, planning studies and data assessment, generation availability assessment, adoption of CEA planning criteria, steady-state and transient security standards, substation/switchgear criteria, transmission line routing and design criteria, reactive compensation, and data exchange through Annexures A and B.

Chapter 4 covers connectivity conditions. It fixes connection/interface points, maximum injection quantum by voltage, separate connectivity modes for generators/CGPs above 15 MVA and up to 15 MVA, treatment of existing non-compliant connections, distribution licensee and inter-utility connections, application procedure under the Open Access Regulations, general conditions of connectivity, telemetry from 1 MW, safety isolating devices, and equipment design criteria for generating units and excitation systems.

Standard name
Grid Code
Primary topics
Grid operation and grid code, Network planning and investment, Connectivity and GNA

Read with this

No other documents to read with it are on Voltaic.

2 more documents belong here and are not on Voltaic: 1 copy in another language and 1 corrigendum not held as English text.

Voltaic last read CSERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document CSERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of CSERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cserc.gov.in ↗

Report an issue with this document